MaintainX Asset Hub logo
EnterprisePricing
Pentair

Pentair Plunger Pump 2220B-P

Need answers fast?
Explore the manual using AI.

Pentair Plunger Pump 2220B-P
Pentair Plunger Pump 2220B-P

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Pentair Plunger Pump 2220B-P

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Pentair Plunger Pump 2220B-P

Pentair Plunger Pump 2220B-P

Create an account to install this asset package.

Maintenance Plans for Pentair Plunger Pump Model 2220B-P

Integrate maintenance plans directly into your work orders in MaintainX.

Initial 40 Hours Pump Lubrication

Check mark

IMPORTANT: Hypro PowerLine Plus pumps are filled with Hypro Oil.

Check mark

Oil Change Frequency

Check mark

Change oil after 40 hours of break-in operation.

Check mark

Change oil every three months or 500 hours, whichever comes first.

Check mark

Lubrication Check

Check mark

Check the oil level using the dipstick.

Check mark

Is the oil level adequate?

Check mark

Oil Specification

Check mark

Use Hypro Oil (P/N 2160-0038).

Run this procedureArrow right

Oil Seal Replacement

Check mark

Preparation

Check mark

Gather required tools

Check mark

Oil Drainage

Check mark

Drain the oil from the crankcase using a 9/16" hex wrench

Check mark

Disassembly

Check mark

Remove the cylinder head

Check mark

Remove the plunger retaining nuts with a 9/16" hex wrench

Check mark

Remove the plungers and slinger rings

Check mark

Inspection

Run this procedureArrow right

Plunger Replacement

Check mark

Pump Head Removal

Check mark

Remove the pump head from the crankcase as described in the packing replacement section.

Check mark

Plunger Removal

Check mark

Remove the plunger retaining nut.

Check mark

Carefully slide the plunger off of the lower plunger.

Check mark

Remove the o-ring from the lower plunger.

Check mark

Remove the plunger retaining nut and slinger ring.

Check mark

Plunger Inspection

Check mark

Inspect the plungers for cracking or damage.

Run this procedureArrow right

Valve Assembly Replacement

Check mark

Disassembly

Check mark

Remove the valve cap (Figure 9, Ref. 1)

Check mark

Remove the valve assembly (Ref. 3) from the head using needle nose pliers

Check mark

Remove the o-ring (Ref. 4) from below the valve assembly

Check mark

Remove the o-ring (Ref. 2) from the valve cap

Check mark

Reassembly

Check mark

Reassemble the parts by reversing the disassembly steps

Check mark

Torque Specifications

Check mark

Select the series of the valve cap for torque specification

Run this procedureArrow right

3 Monthly / 500 Hourly Pump Lubrication

Check mark

Pre-Lubrication Check

Check mark

Check the oil level using the dipstick

Check mark

Is the oil level adequate?

Check mark

Oil Change

Check mark

Use Hypro Oil (P/N 2160-0038) for lubrication

Check mark

Enter the crankcase capacity for PowerLine Plus 2200B-P pumps

Check mark

Change oil every 500 hours of operation

Check mark

Post-Lubrication Check

Check mark

Verify lubrication recommendations marked on the crankcase

Run this procedureArrow right

Parts for Pentair Plunger Pump 2220B-P

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Hypro Oil

2160-0038

Key, 1-1/4" long

1610-0021

Seal

2102-0017

Gearbox Cover

0703-8800A

Gasket

1710-0013

Hypro Oil

2160-0038

Key, 1-1/4" long

1610-0021

Seal

2102-0017

Gearbox Cover

0703-8800A

Gasket

1710-0013

Hypro Oil

2160-0038

Key, 1-1/4" long

1610-0021

Seal

2102-0017

Gearbox Cover

0703-8800A

Gasket

1710-0013

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Pentair

Explore Other Assets