Manual for Pentair Plunger Pump 2410B-P

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Pentair Plunger Pump 2410B-P

Pentair Plunger Pump 2410B-P

Create an account to install this asset package.

Maintenance Plans for Pentair Plunger Pump Model 2410B-P

Integrate maintenance plans directly into your work orders in MaintainX.

3 Monthly / 500 Hourly Pump Lubrication

Check mark

Pre-Lubrication Check

Check mark

Check the oil level using the dipstick

Check mark

Is the oil level adequate?

Check mark

Oil Change

Check mark

Use Hypro Oil (P/N 2160-0038) for lubrication

Check mark

Enter the crankcase capacity for PowerLine Plus 2400B-P/2430B-P pumps

Check mark

Change oil after 500 hours of operation or every three months, whichever comes first

Check mark

Post-Lubrication Check

Check mark

Verify lubrication recommendations marked on the crankcase

Run this procedureArrow right

Caviation Check

Check mark

Water Flow Test

Check mark

Time to fill a one or five-gallon container

Check mark

Does the water supply exceed the required gallons per minute?

Check mark

Suction Line and Strainer Check

Check mark

Is the suction line size adequate?

Check mark

Inspect line strainers for cleanliness and capacity

Check mark

Vacuum and Temperature Check

Check mark

Measure vacuum at the suction side

Check mark

Is the pump protected from overheating?

Run this procedureArrow right

Packing Replacement

Check mark

Head Removal

Check mark

Remove six head bolts using a 1/4" Allen wrench.

Check mark

Turn the shaft to push the head from the crankcase assembly.

Check mark

Pull the head off the plungers.

Check mark

Cup Retainer Assembly Removal

Check mark

Remove the cup retainer assembly from the cylinder head using fingers or external pliers.

Check mark

Remove the Teflon backup ring and the high pressure cup from the head.

Check mark

Seal and O-ring Removal

Check mark

Remove the low pressure seal from the cup retainer with a small flat-blade screwdriver.

Run this procedureArrow right

Oil Seal Replacement

Check mark

Preparation

Check mark

Refer to packing replacement instructions for head removal

Check mark

Remove the plunger nut, plunger, and slinger ring

Check mark

Oil Seal Retainer Cartridge Removal

Check mark

Lift the oil seal retainer cartridge from the crankcase using a 90˚Allen wrench or bent bar

Check mark

Use the slot under each plunger to access the cartridge

Check mark

Old Oil Seal and O-ring Removal

Check mark

Push the old oil seal out of the cartridge

Check mark

Remove the o-ring from the outside of the cartridge

Run this procedureArrow right

Valve Assembly Replacement

Check mark

Disassembly

Check mark

Remove the valve cap (Figure 9, Ref. 1)

Check mark

Remove the valve assembly (Ref. 3) from the head using needle nose pliers

Check mark

Remove the o-ring (Ref. 4) from below the valve assembly

Check mark

Remove the o-ring (Ref. 2) from the valve cap

Check mark

Reassembly

Check mark

Reassemble by reversing the disassembly steps

Check mark

Final Checks

Check mark

Enter the torque specifications for the valve cap

Run this procedureArrow right

Parts for Pentair Plunger Pump 2410B-P

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Hypro Oil

2160-0038

Key, 1-1/4" long

1610-0021

Seal

2102-0017

Gearbox Cover

0703-8800A

Gasket

1710-0013

Hypro Oil

2160-0038

Key, 1-1/4" long

1610-0021

Seal

2102-0017

Gearbox Cover

0703-8800A

Gasket

1710-0013

Hypro Oil

2160-0038

Key, 1-1/4" long

1610-0021

Seal

2102-0017

Gearbox Cover

0703-8800A

Gasket

1710-0013

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Pentair

Explore Other Assets