

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Iwaki Electromagnetic Metering Pump EHN-CN21
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pump Head Bolt Maintenance
Inspection and Preparation
Inspect the pump head mounting bolts for any signs of loosening or damage.
Are all bolts in good condition?
Retightening Procedure
Enter the specified tightening torque value for the bolts.
Use a hexagon wrench for the torque wrench.
Retighten the pump head mounting bolts evenly in a diagonal order.
Post-Maintenance Check
Have all bolts been retightened to the specified torque?
Electromagnetic Metering Pump Maintenance
Safety Precautions
Wear protective clothing such as eye protection, chemical resistant gloves, a mask, and a face shield.
Refer to SDS precautions from the solution supplier.
Turn off power to stop the pump and related devices before service is performed.
Stop the pump by key operation and wait for three seconds before unplugging the pump.
Inspection and Troubleshooting
Inspect the pump for any visible damage or wear.
Describe any issues found during inspection.
Wear Part Replacement
Wear Parts Replacement
Precautions
Release the pressure from the discharge line before disconnecting plumbing or disassembly of the pump.
Rinse wet ends thoroughly with tap water.
Before Replacement
Release pressure from the pump head and the discharge line.
Stop the pump operation.
Rotate the adjusting screw two revolutions anticlockwise to open the air vent port.
Is the air vent line established?
If the air vent line is not established, describe the method used to safely remove the discharge line under pressure.
1 Daily Pump Inspection
Initial Inspection
Check the following points
Suspend operation if any abnormal or dangerous conditions are noticed
Pumping Inspection
Is liquid being pumped?
Method of inspection for liquid pumping
Are the suction and discharge pressures normal?
Has the liquid deteriorated, crystallized, or precipitated?
Noise and Vibration Inspection
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













