Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Pentair Plunger Pump 2430B-P
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial 40 Hours Pump Lubrication
Oil Level Check
Check the oil level using the dipstick
Is the oil level adequate?
Oil Change
Change the oil after 40 hours of break-in operation
Enter the amount of oil added (in fl. oz.)
Post Lubrication Check
Verify the following lubrication recommendations on the crankcase
Is the lubrication recommendation followed as marked on the crankcase?
Valve Assembly Replacement
Disassembly
Remove the valve cap (Figure 9, Ref. 1)
Remove the valve assembly (Ref. 3) from the head using needle nose pliers
Remove the o-ring (Ref. 4) from below the valve assembly
Remove the o-ring (Ref. 2) from the valve cap
Reassembly
Reassemble the parts by reversing the disassembly steps
Final Checks
Enter the torque specifications for the valve cap
Caviation Check
Water Flow Test
Time taken to fill the test container
Required gallons per minute (GPM) for the system
Does the water supply exceed the required GPM?
Preventive Measures to Avoid Cavitation
Ensure the following preventive measures are in place
Vacuum Check
Vacuum level at suction side
Pump Protection
Packing Replacement
Head Removal
Remove six head bolts using a 1/4" Allen wrench.
Turn the shaft to push the head from the crankcase assembly.
Pull the head off the plungers.
Cup Retainer Assembly Removal
Remove the cup retainer assembly from the cylinder head using fingers or external pliers.
Remove the Teflon backup ring and the high pressure cup from the head.
Seal and O-ring Removal
Remove the low pressure seal from the cup retainer with a small flat-blade screwdriver.
Plunger Replacement
Pump Head Removal
Remove the pump head from the crankcase as described in the packing replacement section.
Plunger Removal
Remove the plunger retaining nut.
Carefully slide the plunger off of the lower plunger.
Remove the o-ring from the lower plunger.
Remove the plunger retaining nut and slinger ring.
Plunger Inspection
Inspect the plungers for cracking or damage.
Access the parts list for your equipment in MaintainX.
Hypro Oil
2160-0038
Key, 1-1/4" long
1610-0021
Seal
2102-0017
Gearbox Cover
0703-8800A
Gasket
1710-0013
Hypro Oil
2160-0038
Key, 1-1/4" long
1610-0021
Seal
2102-0017
Gearbox Cover
0703-8800A
Gasket
1710-0013
Hypro Oil
2160-0038
Key, 1-1/4" long
1610-0021
Seal
2102-0017
Gearbox Cover
0703-8800A
Gasket
1710-0013
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX