MaintainX, an Autodesk company
EnterprisePricing
Daikin

Daikin Air Conditioner Outdoor Unit ARKC09RV2S

Need answers fast?
Explore the manual using AI.

Daikin Air Conditioner Outdoor Unit ARKC09RV2S
Daikin Air Conditioner Outdoor Unit ARKC09RV2S

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Air Conditioner Outdoor Unit ARKC09RV2S

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Air Conditioner Outdoor Unit ARKC09RV2S

Daikin Air Conditioner Outdoor Unit ARKC09RV2S

Create an account to install this asset package.

Maintenance Plans for Daikin Air Conditioner Outdoor Unit Model ARKC09RV2S

Integrate maintenance plans directly into your work orders in MaintainX.

Reactor, Partition Plate Maintenance

Check mark

Warning: Wait for 10 minutes after turning off all power supplies before disassembling work

Check mark

Remove the 2 screws of the reactor

Check mark

Slide the reactor upward to unfasten the 2 hooks

Check mark

Remove the reactor

Check mark

Remove the 2 screws, and then the partition plate

Check mark

Reassembly Instructions

Check mark

Fit the hole on the partition plate to the hook on the bottom frame

Check mark

Check that all parts are reassembled correctly

Check mark

Describe any issues encountered during maintenance

Run this procedureArrow right

PCB Maintenance

Check mark

Safety Precautions

Check mark

Wait for 10 minutes after turning off all power supplies before starting disassembly

Check mark

Removal Procedure

Check mark

Remove the earth/ground screws

Check mark

Remove the PCB screws

Check mark

Unfasten the hooks and remove the PCB

Check mark

Reassembly Instructions

Check mark

Fit the projections to the PCB during reassembly

Run this procedureArrow right

Compressor Maintenance

Check mark

Safety Precautions

Check mark

Wait for 10 minutes after turning off all power supplies before disassembling work

Check mark

Ensure pipes and parts heated by the gas brazing machine are cool to avoid burns

Check mark

Ventilate the room if refrigerant gas leaks during work

Check mark

Prepare wet cloth to extinguish fire immediately in case refrigerant oil catches fire

Check mark

Do not discharge refrigerant gas into the atmosphere; collect all refrigerant gas

Check mark

Restore piping by non-oxidation brazing

Check mark

Ensure refrigerant gas is empty in the circuit before working

Check mark

Apply nitrogen replacement when heating up the brazed part

Run this procedureArrow right

Thermistor Maintenance

Check mark

Warning: Wait for 10 minutes after turning off all power supplies before disassembling

Check mark

Removal Procedure

Check mark

Pull out the discharge pipe temperature thermistor

Check mark

Ensure the fixture for the thermistor is not lost

Check mark

Cut the clamp

Check mark

Check for sound blanket (back) and remove if present

Check mark

Pull out the outdoor heat exchanger thermistor and remove the thermistor ASSY

Check mark

Ensure the clip for the thermistor is not lost

Run this procedureArrow right

Electrical Box Maintenance

Check mark

Safety Precautions

Check mark

Wait for 10 minutes after turning off all power supplies before disassembling work

Check mark

Disassembly Procedure

Check mark

Remove the 7 screws on the terminal board and disconnect the connecting wire and power supply wire

Check mark

Remove the 3 screws, and then the wire fixture

Check mark

Disconnect the connector [S80] (four way valve coil)

Check mark

Disconnect the connector [S20] (electronic expansion valve coil)

Check mark

Disconnect the 2 connectors from the reactor

Check mark

Disconnect the connector [S30] (compressor)

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets