

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Daikin Air Conditioner Outdoor Unit ARKC09RV2S
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Reactor, Partition Plate Maintenance
Warning: Wait for 10 minutes after turning off all power supplies before disassembling work
Remove the 2 screws of the reactor
Slide the reactor upward to unfasten the 2 hooks
Remove the reactor
Remove the 2 screws, and then the partition plate
Reassembly Instructions
Fit the hole on the partition plate to the hook on the bottom frame
Check that all parts are reassembled correctly
Describe any issues encountered during maintenance
PCB Maintenance
Safety Precautions
Wait for 10 minutes after turning off all power supplies before starting disassembly
Removal Procedure
Remove the earth/ground screws
Remove the PCB screws
Unfasten the hooks and remove the PCB
Reassembly Instructions
Fit the projections to the PCB during reassembly
Compressor Maintenance
Safety Precautions
Wait for 10 minutes after turning off all power supplies before disassembling work
Ensure pipes and parts heated by the gas brazing machine are cool to avoid burns
Ventilate the room if refrigerant gas leaks during work
Prepare wet cloth to extinguish fire immediately in case refrigerant oil catches fire
Do not discharge refrigerant gas into the atmosphere; collect all refrigerant gas
Restore piping by non-oxidation brazing
Ensure refrigerant gas is empty in the circuit before working
Apply nitrogen replacement when heating up the brazed part
Thermistor Maintenance
Warning: Wait for 10 minutes after turning off all power supplies before disassembling
Removal Procedure
Pull out the discharge pipe temperature thermistor
Ensure the fixture for the thermistor is not lost
Cut the clamp
Check for sound blanket (back) and remove if present
Pull out the outdoor heat exchanger thermistor and remove the thermistor ASSY
Ensure the clip for the thermistor is not lost
Electrical Box Maintenance
Safety Precautions
Wait for 10 minutes after turning off all power supplies before disassembling work
Disassembly Procedure
Remove the 7 screws on the terminal board and disconnect the connecting wire and power supply wire
Remove the 3 screws, and then the wire fixture
Disconnect the connector [S80] (four way valve coil)
Disconnect the connector [S20] (electronic expansion valve coil)
Disconnect the 2 connectors from the reactor
Disconnect the connector [S30] (compressor)
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













