MaintainX, an Autodesk company
EnterprisePricing
Daikin

Daikin Air Conditioner Outdoor Unit RKC35PVM

Need answers fast?
Explore the manual using AI.

Daikin Air Conditioner Outdoor Unit RKC35PVM
Daikin Air Conditioner Outdoor Unit RKC35PVM

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Air Conditioner Outdoor Unit RKC35PVM

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Air Conditioner Outdoor Unit RKC35PVM

Daikin Air Conditioner Outdoor Unit RKC35PVM

Create an account to install this asset package.

Maintenance Plans for Daikin Air Conditioner Outdoor Unit Model RKC35PVM

Integrate maintenance plans directly into your work orders in MaintainX.

Electronic Expansion Valve Coil, Four Way Valve Maintenance

Check mark

Safety Precautions

Check mark

Wait for 10 minutes after turning off all power supplies before starting disassembly

Check mark

Ensure pipes and parts heated by gas brazing machine are cool to avoid burns

Check mark

Ventilate the room if refrigerant gas leaks during work

Check mark

Avoid exposing refrigerant gas to flames to prevent toxic gas generation

Check mark

Environmental Cautions

Check mark

Do not discharge refrigerant gas into the atmosphere

Check mark

Collect all refrigerant gas

Check mark

Restoration Cautions

Run this procedureArrow right

Thermistor Maintenance

Check mark

Warning: Wait for 10 minutes after turning off all power supplies before disassembling

Check mark

Pull out the discharge pipe temperature thermistor

Check mark

Ensure the fixture for the thermistor is not lost

Check mark

Cut the clamp

Check mark

Check for sound blanket (back) presence

Check mark

Remove the sound blanket (back) if present

Check mark

Pull out the outdoor heat exchanger thermistor

Check mark

Remove the thermistor ASSY

Check mark

Ensure the clip for the thermistor is not lost

Run this procedureArrow right

Reactor, Partition Plate Maintenance

Check mark

Warning: Wait for 10 minutes after turning off all power supplies before disassembling

Check mark

Remove the 2 screws of the reactor

Check mark

Slide the reactor upward to unfasten the 2 hooks

Check mark

Remove the reactor

Check mark

Remove the 2 screws, and then the partition plate

Check mark

Reassembly Instructions

Check mark

Fit the hole on the partition plate to the hook on the bottom frame

Run this procedureArrow right

PCB Maintenance

Check mark

Safety Precautions

Check mark

Wait for 10 minutes after turning off all power supplies before disassembling

Check mark

Removal Procedure

Check mark

Remove the 2 earth/ground screws

Check mark

Check for ferrite core on the earth/ground harness

Check mark

Remove the 3 screws of the PCB

Check mark

Unfasten the 2 hooks and remove the PCB

Check mark

Reassembly Check

Check mark

Ensure the 2 projections are fitted to the PCB during reassembly

Run this procedureArrow right

Electrical Box Maintenance

Check mark

Safety Precautions

Check mark

Wait for 10 minutes after turning off all power supplies before starting disassembly

Check mark

Disassembly Procedure

Check mark

Remove the 7 screws on the terminal board and disconnect the connecting wire and power supply wire

Check mark

Remove the 3 screws, and then the wire fixture

Check mark

Disconnect the connector [S80] (four way valve coil)

Check mark

Disconnect the connector [S20] (electronic expansion valve coil)

Check mark

Disconnect the 2 connectors from the reactor

Check mark

Disconnect the connector [S30] (compressor)

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets