

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Daikin Air Conditioner Outdoor Unit RKC35QVM
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Outdoor Fan, Fan Motor Maintenance
Safety Precautions
Wait for 10 minutes after turning off all power supplies before starting disassembly
Removal Procedure
Remove the nut and then the outdoor fan
Disconnect the connector depending on the model
Cut the clamp and release the fan motor lead wire from the groove
Remove the screw and then the fan motor fixing frame
Unfasten the 2 hooks on the fan motor fixing frame and release the fan motor lead wire
Remove the 3 screws and then the fan motor
Compressor Maintenance
Safety Precautions
Wait for 10 minutes after turning off all power supplies before disassembling work
Ensure pipes and parts heated by the gas brazing machine are cool to avoid burns
Ventilate the room if refrigerant gas leaks during work
Prepare wet cloth to extinguish fire immediately in case refrigerant oil catches fire
Collect all refrigerant gas to avoid discharging into the atmosphere
Apply nitrogen replacement when heating up the brazed part
Avoid using a metal saw for cutting pipes to prevent sawdust contamination
Use a protective sheet or steel plate to shield peripheries from brazing flame
Reactor, Partition Plate Maintenance
Warning
Wait for 10 minutes or more after turning off all power supplies before disassembling work
Removal Procedure
Remove the screws of the reactor
Slide the reactor upward to unfasten the hooks
Remove the reactor
Remove the screws and the partition plate
Reassembly Instructions
Fit the hole on the partition plate to the hook on the bottom frame
Electronic Expansion Valve Coil, Four Way Valve Maintenance
Safety Precautions
Wait for 10 minutes after turning off all power supplies before starting disassembly
Ensure pipes and parts heated by gas brazing machine are cool to avoid burns
Ventilate the room if refrigerant gas leaks during work
Avoid exposing refrigerant gas to flames to prevent toxic gas generation
Environmental Cautions
Do not discharge refrigerant gas into the atmosphere
Collect all refrigerant gas
Restoration Cautions
PCB Maintenance
Safety Precautions
Wait for 10 minutes after turning off all power supplies before starting disassembly
Removal Procedure
Remove the earth/ground screws
Does the model have a ferrite core on the earth/ground harness?
Remove the PCB screws
Unfasten the hooks and remove the PCB
Reassembly Check
Ensure the 2 projections are fitted to the PCB during reassembly
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













