

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Daikin Air Conditioner Outdoor Unit RKC12PV2S
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
PCB Maintenance
Safety Precautions
Wait for 10 minutes after turning off all power supplies before starting disassembly
Removal Procedure
Remove the earth/ground screws
Does the model have a ferrite core on the earth/ground harness?
Remove the PCB screws
Unfasten the hooks and remove the PCB
Reassembly Check
Ensure the 2 projections are fitted to the PCB during reassembly
Electrical Box Maintenance
Pre-Disassembly Safety Check
Ensure all power supplies are turned off
Wait for 10 minutes after turning off power supplies before starting disassembly
Disassembly Procedure
Remove the 7 screws on the terminal board and disconnect the connecting wire and power supply wire
Remove the 3 screws, and then the wire fixture
Disconnect the connector [S80] (four way valve coil)
Disconnect the connector [S20] (electronic expansion valve coil)
Disconnect the 2 connectors from the reactor
Sound Blankets Maintenance
Safety Precautions
Waited for 10 minutes after turning off all power supplies?
Sound Blanket Removal
Remove the sound blanket (top)
Untie the 2 strings and pull out the sound blanket (outer)
Pull out the sound blanket (inner)
Thermistor Maintenance
Warning: Wait for 10 minutes after turning off all power supplies before disassembling
Removal Procedure
Pull out the discharge pipe temperature thermistor
Ensure the fixture for the thermistor is not lost
Cut the clamp
Check for sound blanket (back) and remove if present
Pull out the outdoor heat exchanger thermistor and remove the thermistor ASSY
Ensure the clip for the thermistor is not lost
Outer Panels Maintenace
Safety Precautions
Waited for 10 minutes after turning off all power supplies?
Removal Procedure
Remove the screw of the stop valve cover
Pull down and remove the stop valve cover
Ensure the 3 hooks are fitted when reassembling
Remove the 3 screws, and then the top panel
Remove the 6 screws of the front panel
Lift up the right side of the front panel and unfasten the 2 hooks
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













