MaintainX Asset Hub logo
EnterprisePricing
BINDER

BINDER Incubator BD 720-UL

Need answers fast?
Explore the manual using AI.

BINDER Incubator BD 720-UL
BINDER Incubator BD 720-UL

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

BINDER Incubator BD 720-UL

BINDER Incubator BD 720-UL

Create an account to install this asset package.

Maintenance Plans for BINDER Incubator Model BD 720-UL

Integrate maintenance plans directly into your work orders in MaintainX.

Chamber Decontamination

Check mark

Safety Precautions

Check mark

Disconnect the chamber from the power supply

Check mark

Pull the power plug

Check mark

Use adequate personal safety controls

Check mark

Decontamination Methods

Check mark

Select the decontamination method

Check mark

Are all inflammable goods removed from the interior?

Check mark

Ensure the unit is absolutely dry and ventilated before start-up

Check mark

Disinfectant Use

Run this procedureArrow right

Safety Controller Check

Check mark

Functionality Check

Check mark

Verify the functionality of the safety controller

Check mark

Is the safety controller functioning properly?

Check mark

Temperature Set-point Verification

Check mark

Enter the current temperature set-point of the safety controller

Check mark

Enter the desired temperature set-point

Check mark

Set the safety controller set-point 2 °C to 5 °C above the desired temperature set-point

Check mark

Is the safety controller set-point correctly adjusted above the desired temperature set-point?

Run this procedureArrow right

Initial Equipment Check

Check mark

Unpacking and Initial Inspection

Check mark

Unpack the equipment carefully

Check mark

Check the chamber and optional accessories for completeness and transportation damage

Check mark

Inform the carrier if transportation damage has occurred

Check mark

Post-Unpacking Actions

Check mark

Remove transportation protection devices and adhesives from the chamber and doors

Check mark

Take out the operating manuals and accessory equipment

Check mark

Safety Precautions

Check mark

Ensure chamber is lifted from the pallet at its four lower corners with the aid of 2 people

Run this procedureArrow right

Chamber Cleaning

Check mark

Safety Precautions

Check mark

Disconnect the chamber from the power supply before cleaning.

Check mark

Disconnect the power plug.

Check mark

Wear protective gloves and goggles.

Check mark

Ensure no water or cleaning agents are spilled over the inner and outer surfaces.

Check mark

Cleaning Procedure

Check mark

Select the surfaces to clean

Check mark

Wipe the surfaces with a moistened towel.

Check mark

Select the cleaning agents used

Run this procedureArrow right

1 Yearly Chamber Maintenance

Check mark

Safety Precautions

Check mark

Disconnect the power plug before starting maintenance

Check mark

Ensure the unit does not become wet during maintenance

Check mark

Do not remove the rear panel of the unit

Check mark

Ensure maintenance is conducted by licensed electricians or authorized experts

Check mark

Maintenance Steps

Check mark

Inspect the door gasket for wear and tear

Check mark

Replace the door gasket if necessary, ensuring it is cold before replacement

Check mark

Post-Maintenance Recommendations

Run this procedureArrow right

Parts for BINDER Incubator BD 720-UL

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Rack, Chrome-Plated

6004-0006

Rack, Stainless Steel

6004-0010

Rack, Perforated, Stainless Steel

6004-0033

Door Gasket, Silicone

6005-0099

Unit Fuse 5X20Mm 250V 10A Semi Time Lag (M)

5006-0012

Rack, Chrome-Plated

6004-0006

Rack, Stainless Steel

6004-0010

Rack, Perforated, Stainless Steel

6004-0033

Door Gasket, Silicone

6005-0099

Unit Fuse 5X20Mm 250V 10A Semi Time Lag (M)

5006-0012

Rack, Chrome-Plated

6004-0006

Rack, Stainless Steel

6004-0010

Rack, Perforated, Stainless Steel

6004-0033

Door Gasket, Silicone

6005-0099

Unit Fuse 5X20Mm 250V 10A Semi Time Lag (M)

5006-0012

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from BINDER

Explore Other Assets