

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Still Electric Forklift RX20-16PL
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1000 Hourly / 1 Yearly Lift Mast Check
Check the mast bearings for damage
Lubricate the mast bearings and check the tightening torque
Check the mast profiles for damage and wear
Lubricate the mast profiles
Check the guide in the lower (load reversal) mast profile for damage and for wear
Check the load chains for damage and wear
Adjust and lubricate the load chains
Check the lift cylinders and connections for damage and for leaks
Check the guide pulleys for damage and for wear
1000 Hourly / 1 Yearly Hydraulic System Check
1. Check the condition of the hydraulic system, check that it is working correctly and check for leaks - Hose lines must be changed if
• The outer layer has been breached or becomes brittle with tears
• They are leaking
• There are unnatural deformations (e.g. bubble formation or buckling)
• A fitting is detached from the hose
• A fitting is badly damaged or corroded
- Pipes must be changed if
• There is abrasion with the loss of material
• There are unnatural deformations and detectable bending stress
Seat Belt Maintenance
- Cleaning the seat belt
1. Clean the seat belt as necessary, but without using chemical cleaning materials (a brush will suffice)
- Replacement after an accident
1. As a rule, the seat belt must be changed after an accident;
Lift Mast and Roller Track Lubrication
Dirt and lubricant residue removed from the roller track
Roller tracks of the outside, middle, and inside mast lubricated with a super-pressure adhesion lubricant
NOTE! Spray the roller track evenly from a distance of approx. 15-20 cm. Wait approx. 15 minutes until the equipment is ready to use again
Sign off on the lubrication process
1000 Hourly Interlock Mechanism Lubrication
NOTE! The interval for greasing is influenced significantly by the application conditions and the environmental conditions affecting the truck. Visual inspections and function checking of the interlock must be carried out as required and after every 1000 hours. Grease all moving parts of the interlock as necessary
Open the battery door (1)
Check that the door lock (2) and the battery lock (4) move easily and that they are not deformed or damaged
Check that the indexing bolt (3) on the door lock is seated correctly and that it is not deformed or damaged
Grease the mechanisms of the interlocks
Close the battery door again
Sign off on the interlock mechanism lubrication
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













