

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

New London Engineering Conveyor 600
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
6 Monthly/2500 Hourly Reducer Lubricant Replacement
Verify the need for lubricant replacement
Select the appropriate lubricant based on ambient temperature
Select the lubricant brand for AGMA Compound #7
Select the lubricant brand for AGMA Compound #8
Drain the old lubricant from the reducer
Inspect the drained lubricant for contaminants
Dispose of the old lubricant according to environmental regulations
Fill the reducer with the selected lubricant
Check for leaks after filling
Reducer Maintenance
Reducer Inspection
Ensure all parts are in place
Is the reducer vent plug clear and operating?
Oil Level Check
Enter the current oil level at the level plug
Is the oil level at the bottom of the threaded hole of the level plug?
Is extra oil required due to conveyor and reducer inclination?
Post Maintenance
Clean the area around the reducer
Conveyor Maintenance
Inspect Conveyor for damages
Inspect Shipment for missing pieces
Locate your instruction manual
Read your instruction manual
Protect your instruction manual
Is the conveyor level and true?
Turntable Support Casters Replacement
Caster Replacement
Loosen the table bearing set screws
Lift the table by 1/8 inch
Remove the caster bolts
Replace the caster with a New London Engineering replacement part
Post-Replacement
Lower the table
Retighten the setscrews
Bearing Replacement
Preparation
Remove the rails
Support the turntable while lifting
Loosen the bearing set screws
Replacement
Mount replacement parts properly
Recheck replacement parts after one day of use
Safety Warning
Ensure the table or drive is not overloaded
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













