MaintainX Asset Hub logo
EnterprisePricing
New London Engineering

New London Engineering Conveyor 311

Need answers fast?
Explore the manual using AI.

New London Engineering Conveyor 311
New London Engineering Conveyor 311

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for New London Engineering Conveyor 311

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

New London Engineering Conveyor 311

New London Engineering Conveyor 311

Create an account to install this asset package.

Maintenance Plans for New London Engineering Conveyor Model 311

Integrate maintenance plans directly into your work orders in MaintainX.

1 Monthly Conveyor Maintenance

Check mark

Motor and Reducer Maintenance

Check mark

Clean off motor

Check mark

Clean off reducer

Check mark

Belting Maintenance

Check mark

Check and adjust belting take up tension

Check mark

Track the belting at both ends of the conveyor

Check mark

Check the belt splice for any damage

Check mark

Frame Inspection

Check mark

Check frame for issues

Run this procedureArrow right

Bearing Replacement

Check mark

Preparation

Check mark

Remove the rails

Check mark

Support the turntable while lifting

Check mark

Loosen the bearing set screws

Check mark

Replacement

Check mark

Mount replacement parts properly

Check mark

Recheck replacement parts after one day of use

Check mark

Safety Warning

Check mark

Document any overload incidents

Run this procedureArrow right

6 Monthly/2500 Hourly Reducer Lubricant Replacement

Check mark

Verify the operational hours of the reducer

Check mark

Determine the ambient temperature range

Check mark

Select the appropriate lubricant based on ambient temperature

Check mark

Select the lubricant brand for AGMA Compound #7

Check mark

Select the lubricant brand for AGMA Compound #8

Check mark

Drain the old lubricant from the reducer

Check mark

Inspect the drained lubricant for contaminants

Check mark

Dispose of the old lubricant according to environmental regulations

Check mark

Fill the reducer with the selected lubricant

Run this procedureArrow right

Conveyor Maintenance

Check mark

Inspect Conveyor for damages

Check mark

Inspect Shipment for missing pieces

Check mark

Locate the instruction manual

Check mark

Read the instruction manual

Check mark

Protect the instruction manual

Check mark

Conveyor Alignment Check

Check mark

Measure conveyor levelness

Check mark

Is the conveyor true?

Run this procedureArrow right

6 Monthly Setscrews And Drive Mounts Maintenance

Check mark

Safety Precautions

Check mark

Lock off equipment before maintenance

Check mark

Setscrews and Drive Mounts Retightening

Check mark

Retighten setscrews

Check mark

Retighten drive mounts

Check mark

Bearing Set Screws Maintenance

Check mark

Tighten bearing set screws

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from New London Engineering

Explore Other Assets