New London Engineering Conveyor 301

Need answers fast?
Explore the manual using AI.

New London Engineering Conveyor 301
New London Engineering Conveyor 301

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for New London Engineering Conveyor 301

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

New London Engineering Conveyor 301

New London Engineering Conveyor 301

Create an account to install this asset package.

Maintenance Plans for New London Engineering Conveyor Model 301

Integrate maintenance plans directly into your work orders in MaintainX.

6 Monthly Setscrews And Drive Mounts Maintenance

Check mark

Safety Precautions

Check mark

Lock off equipment before maintenance

Check mark

Ensure all movable equipment is stationary

Check mark

Retighten Setscrews and Drive Mounts

Check mark

Retighten all setscrews

Check mark

Retighten all drive mounts

Check mark

Bearing Set Screws Maintenance

Check mark

Tighten the bearing set screws

Check mark

Perform greasing of bearings

Run this procedureArrow right

Bearing Replacement

Check mark

Preparation

Check mark

Remove the rails

Check mark

Support the turntable while lifting

Check mark

Bearing Removal and Replacement

Check mark

Loosen the bearing set screws

Check mark

Mount replacement parts properly

Check mark

Recheck replacement parts after one day of use

Check mark

Safety Warning

Check mark

WARNING: Never overload the table or drive

Run this procedureArrow right

1 Monthly Conveyor Maintenance

Check mark

Motor and Reducer Maintenance

Check mark

Clean off motor

Check mark

Clean off reducer

Check mark

Belting Maintenance

Check mark

Check and adjust belting take up tension

Check mark

Track the belting at both ends of the conveyor

Check mark

Check the belt splice for any damage

Check mark

Frame Inspection

Check mark

Check frame for issues

Run this procedureArrow right

6 Monthly/2500 Hourly Reducer Lubricant Replacement

Check mark

Verify if the gearmotor requires lubricant change

Check mark

Select the ambient temperature range

Check mark

Select the lubricant based on the ambient temperature

Check mark

Drain the old lubricant from the reducer

Check mark

Refill the reducer with the selected lubricant

Check mark

Check for any leaks after refilling

Check mark

Clean the area after lubricant replacement

Run this procedureArrow right

3 Monthly Conveyor Maintenance

Check mark

Drive Tire Air Pressure Check

Check mark

Enter the air pressure of the drives tire (Model 181-Turntable)

Check mark

Is the tire air pressure within the recommended range?

Check mark

Bearing Lubrication

Check mark

Select the type of bearings present

Check mark

Are the bearings permanently lubricated?

Check mark

Lubricate non-permanently lubricated bearings with approved lubricants

Check mark

Clean grease zerk fittings before lubrication

Check mark

Wipe excess lube from shaft seals after lubrication

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from New London Engineering

Explore Other Assets