MaintainX Asset Hub logo
EnterprisePricing
New London Engineering

New London Engineering Conveyor 505

Need answers fast?
Explore the manual using AI.

New London Engineering Conveyor 505
New London Engineering Conveyor 505

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for New London Engineering Conveyor 505

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

New London Engineering Conveyor 505

New London Engineering Conveyor 505

Create an account to install this asset package.

Maintenance Plans for New London Engineering Conveyor Model 505

Integrate maintenance plans directly into your work orders in MaintainX.

1 Monthly Conveyor Maintenance

Check mark

Motor and Reducer Maintenance

Check mark

Clean off motor

Check mark

Clean off reducer

Check mark

Belting Maintenance

Check mark

Check and adjust belting take up tension

Check mark

Track the belting at both ends of the conveyor

Check mark

Check the belt splice for any damage

Check mark

Frame Inspection

Check mark

Check frame for issues

Run this procedureArrow right

Turntable Support Casters Replacement

Check mark

Caster Replacement

Check mark

Loosen the table bearing set screws

Check mark

Lift the table by 1/8 inch

Check mark

Remove the caster bolts

Check mark

Replace the caster with a New London Engineering replacement part

Check mark

Post-Replacement

Check mark

Lower the table

Check mark

Retighten the setscrews

Run this procedureArrow right

Bearing Replacement

Check mark

Preparation

Check mark

Remove the rails

Check mark

Support the turntable while lifting

Check mark

Bearing Removal

Check mark

Loosen the bearing set screws

Check mark

Bearing Installation

Check mark

Mount replacement parts properly

Check mark

Recheck replacement parts after one day of use

Check mark

Safety Warning

Run this procedureArrow right

3 Monthly Conveyor Maintenance

Check mark

Drive Tire Air Pressure Check

Check mark

Enter the air pressure of the drives tire (Model 181-Turntable)

Check mark

Is the air pressure within the recommended range?

Check mark

Bearing Lubrication

Check mark

Select the type of bearings present

Check mark

Are the bearings permanently lubricated?

Check mark

Select the lubricant used for lubrication

Check mark

Was the lubrication process completed without over-lubrication?

Check mark

Clean off grease zerk fittings before lubrication

Run this procedureArrow right

Reducer Maintenance

Check mark

Reducer Inspection

Check mark

Ensure all mounting bolts are tightened securely

Check mark

Check that the reducer sprocket is installed as close to the reducer as possible

Check mark

Is the reducer clean for better heat dissipation?

Check mark

Oil Level Check

Check mark

Enter the current oil level at the level plug

Check mark

Is the oil level at the bottom of the threaded hole of the level plug?

Check mark

Is extra oil required due to conveyor and reducer inclination?

Check mark

Vent Plug Inspection

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from New London Engineering

Explore Other Assets