Flowserve Pump 10-MFC-24

Need answers fast?
Explore the manual using AI.

Flowserve Pump 10-MFC-24
Flowserve Pump 10-MFC-24

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Flowserve Pump 10-MFC-24

Flowserve Pump 10-MFC-24

Create an account to install this asset package.

Maintenance Plans for Flowserve Pump Model 10-MFC-24

Integrate maintenance plans directly into your work orders in MaintainX.

Pump Startup Check

Check mark

5.1 Pre-commissioning procedure

Check mark

Ensure the following pre-commissioning checks are completed

Check mark

Fill pump bearings with recommended lubricant

Check mark

Check all vent connections for complete filling of the pump

Check mark

Check the direction of rotation of the pump (Coupling spacer dismantled)

Check mark

Ensure pump rotor and shaft seal are in correct axial position

Check mark

Check readiness of all auxiliary systems (seal system, lubrication system) for start up

Check mark

Ensure all pipe work is connected correctly and absolutely tight

Check mark

Open suction valve and ensure discharge valve is closed or partially open as required

Run this procedureArrow right

500 Hourly Pump Bearing Lubrication

Check mark

5.2.4.2 Recommended grease fill quantities

Check mark

Verify grease fill quantities for Frame 8H

Check mark

6.1.10.2 Grease lubrication

Check mark

Connect grease gun to the nipple

Check mark

Press grease into the bearing housing until the first signs of it appear in the gap between the housing and shaft, then stop greasing

Check mark

Check operating temperature rise above ambient

Check mark

Is the temperature rise above ambient within normal range (not exceeding 55 °C or a combined maximum of 95 °C)?

Check mark

If temperature rise is abnormal, stop the pump and investigate the cause

Check mark

Ensure not to mix greases containing different bases, thickeners, or additives

Run this procedureArrow right

Coupling Alignment Check

Check mark

4.8 Final shaft alignment check

Check mark

Rotate the shaft several times by hand to ensure there is no binding and all parts are free.

Check mark

Recheck the coupling alignment to ensure no pipe strain exists.

Check mark

6.1.2 Periodic inspection (semi-annual)

Check mark

Check the coupling for correct alignment.

Check mark

Inspect for worn driving elements.

Check mark

4.5.4 Alignment criteria for MFC pumps

Check mark

Verify the Total Indicator Reading (TIR) for Woods type coupling

Check mark

Verify the Total Indicator Reading (TIR) for all metal flexible type coupling

Run this procedureArrow right

1 Daily Pump Inspection

Check mark

Routine inspection (daily/weekly)

Check mark

Check operating behavior

Check mark

Check for abnormal fluid or lubricant leaks

Check mark

Check shaft seal leaks

Check mark

Check oil lubricant level and condition

Check mark

Check auxiliary supplies

Run this procedureArrow right

1 Yearly Pump Bearing Lubrication Oil Change

Check mark

Periodic inspection (semi-annual)

Check mark

Ensure maximum time between cleaning and lubrication change is one year

Check mark

Determine if environmental severity dictates shorter frequency

Check mark

Complete cleaning during a major overhaul

Check mark

Dismantle the pump

Check mark

Use a brush and wash out the housing with hot oil or non-toxic solvent

Check mark

Flush the housing with light mineral oil to prevent rust

Check mark

Remove solid particles with a brush dipped in hot oil while spinning the bearing

Check mark

Immerse bearings in hot non-toxic solvent if oxidized grease is present

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Flowserve

Explore Other Assets