MaintainX, an Autodesk company
EnterprisePricing
York

York Single Package Air Conditioner ZXG14D2A3AA1A111A2

Need answers fast?
Explore the manual using AI.

York Single Package Air Conditioner ZXG14D2A3AA1A111A2
York Single Package Air Conditioner ZXG14D2A3AA1A111A2

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for York Single Package Air Conditioner ZXG14D2A3AA1A111A2

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Single Package Air Conditioner ZXG14D2A3AA1A111A2

York Single Package Air Conditioner ZXG14D2A3AA1A111A2

Create an account to install this asset package.

Maintenance Plans for York Single Package Air Conditioner Model ZXG14D2A3AA1A111A2

Integrate maintenance plans directly into your work orders in MaintainX.

Initial 10 Hours Belt Tension Check

Check mark

Belt Drive Blower Adjustments

Check mark

Adjust blower speed and belt tension

Check mark

Verify proper sheave alignment

Check mark

Tighten blower pulley set screws

Check mark

Tighten motor sheave set screws

Check mark

Post 10-12 Hours Run Time Checks

Check mark

Re-check blower pulley set screws

Check mark

Re-check motor sheave set screws

Check mark

Re-check belt tension

Run this procedureArrow right

Gas Piping Cleaning

Check mark

WARNING!

Check mark

Pipe Preparation

Check mark

Clean all piping of dirt and scale by hammering on the outside of the pipe.

Check mark

Blow out loose particles from the pipe.

Check mark

Pre-Start-Up Checks

Check mark

Have all gas lines external to the unit been purged of air?

Run this procedureArrow right

Initial Equipment Inspection

Check mark

Visual Inspection

Check mark

Inspect the unit for visible damage during transit.

Check mark

Note the extent of any damage on the carrier’s freight bill.

Check mark

Carrier Inspection Request

Check mark

Request inspection by the carrier’s agent in writing.

Check mark

Installation Compliance

Check mark

Ensure installation complies with local, state, and national codes.

Check mark

Gas Supply System Testing

Check mark

Is the furnace disconnected from the gas supply piping system?

Run this procedureArrow right

Manifold Gas Pressure Maintenance

Check mark

Preparation

Check mark

Turn off all power to the unit

Check mark

Connect a manometer to the outlet pressure port on the gas valve

Check mark

Access Adjustment Screws

Check mark

Remove cover screws covering HI and LO pressure adjustment screws

Check mark

Adjust Second Stage Pressure

Check mark

Turn on power to the unit

Check mark

Set thermostat to call for second stage heat and start furnace

Check mark

Enter the current manifold pressure for the second stage

Run this procedureArrow right

Blower Rotation Check

Check mark

Initial Setup

Check mark

Ensure ZX units are properly phased at the factory

Check mark

Is the blower rotating in the correct direction at start-up?

Check mark

Electrical Connection Check

Check mark

Is the electrical connection to the unit correctly phased?

Check mark

Change the phasing of the Field Line Connection if necessary

Check mark

High-leg Delta Power Supply Precautions

Check mark

Ensure high-leg conductor is not attached to X13 or ECM motors

Check mark

Measure voltage of A or L1 phase to ground

Run this procedureArrow right

Parts for York Single Package Air Conditioner ZXG14D2A3AA1A111A2

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Flue Extension Kit

1FE0416

Roof Curb

1RC0458

Roof Curb

1RC0456

Thru the Base Electrical and Thru the Curb Gas

1TB0401

Thru the Base Electrical and Thru the Curb Gas

1TB0402

Flue Extension Kit

1FE0416

Roof Curb

1RC0458

Roof Curb

1RC0456

Thru the Base Electrical and Thru the Curb Gas

1TB0401

Thru the Base Electrical and Thru the Curb Gas

1TB0402

Flue Extension Kit

1FE0416

Roof Curb

1RC0458

Roof Curb

1RC0456

Thru the Base Electrical and Thru the Curb Gas

1TB0401

Thru the Base Electrical and Thru the Curb Gas

1TB0402

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from York

Explore Other Assets