MaintainX Asset Hub logo
EnterprisePricing
TECO

TECO Electric Motor AEHE

Need answers fast?
Explore the manual using AI.

TECO Electric Motor AEHE
TECO Electric Motor AEHE

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for TECO Electric Motor AEHE

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

TECO Electric Motor AEHE

TECO Electric Motor AEHE

Create an account to install this asset package.

Maintenance Plans for TECO Electric Motor Model AEHE

Integrate maintenance plans directly into your work orders in MaintainX.

Valve Inspection

Check mark

5.8.2 Valve Inspection

Check mark

Inspect the check valve for any signs of wear or damage

Check mark

Inspect the stop valve for any signs of wear or damage

Check mark

Ensure the check valve is protecting the pump from reverse flow and excessive backpressure

Check mark

Ensure the stop valve is functioning correctly during priming, starting, and shutdown of the pump

Check mark

Close the stop valve before stopping the pump

Check mark

Check for any unusual noises or vibrations when the pump is operated against a high static head

Check mark

Record any issues found during the inspection

Run this procedureArrow right

3 Yearly Non-Reverse Ratchet Pin Replacement

Check mark

Review operating conditions

Check mark

Inspect ratchet pins for deformation

Check mark

Replace ratchet pins

Check mark

Inspect check valve and stop valve

Check mark

Verify normal function of valves

Run this procedureArrow right

1 Monthly Sleeve Bearing Storage Maintenance

Check mark

2.6 Bearing protection — sleeve bearings

Check mark

Ensure the following conditions are met for sleeve bearings

Check mark

Rotate the motor shaft several revolutions to keep bearing journals well oiled and prevent rusting

Check mark

Ensure the shaft does not come to rest in its original position after rotation

Check mark

Push the shaft to both extremes of the endplay while rotating

Run this procedureArrow right

Slip Ring Carbon Brush Pressure Calibration

Check mark

5.7 Maintenance of slip ring

Check mark

Ensure motor is disconnected from power supplies

Check mark

Verify there are no accessible moving parts before maintenance operation

Check mark

5.7.1 Adjustment of carbon brush

Check mark

Measure current brush pressure in psi

Check mark

Is the brush pressure within the normal operation range of 2.8 to 3.6 psi?

Check mark

Is the brush area below 0.08 sq. in. (0.5 cm²) or are frequent vibrations evident?

Check mark

Adjust brush pressure using adjusting screw, pressure adjusting pin, or pressure adjusting plate as necessary

Check mark

Re-measure brush pressure after adjustment

Run this procedureArrow right

Motor Winding Inspection

Check mark

Motor windings inspection

Check mark

Inspect coil-ends for issues

Check mark

Are the wedges in their original position?

Check mark

Is the binding at the coil end in its normal position?

Check mark

Insulation resistance measurement

Check mark

Refer to section 4.1.2 for insulation resistance measurement standards

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from TECO

Explore Other Assets