MaintainX, an Autodesk company
EnterprisePricing
KUKA

KUKA Industrial Robot KR 90 R3100 extra C

Need answers fast?
Explore the manual using AI.

KUKA Industrial Robot KR 90 R3100 extra C
KUKA Industrial Robot KR 90 R3100 extra C

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

KUKA Industrial Robot KR 90 R3100 extra C

KUKA Industrial Robot KR 90 R3100 extra C

Create an account to install this asset package.

Maintenance Plans for KUKA Industrial Robot Model KR 90 R3100 extra C

Integrate maintenance plans directly into your work orders in MaintainX.

10000 Hourly Cable Set Greasing

Check mark

Safety Precautions

Check mark

Activate the EMERGENCY STOP device to secure the robot.

Check mark

Warn all persons concerned before starting to put the robot back into operation.

Check mark

Disassembly

Check mark

Remove 4 Allen screws with conical spring washers.

Check mark

Take off the cover.

Check mark

If necessary, carefully pull back interface A1.

Check mark

Cleaning and Greasing

Check mark

Clean the cables between the push-in module and the inlet of the hollow shaft of axis 1.

Run this procedureArrow right

Industrial Robot Test

Check mark

Pre-Start-up Inspection

Check mark

Ensure the industrial robot is correctly installed and fastened

Check mark

Inspect the robot for visible damage from external forces

Check mark

Check the motor and counterbalancing system for damage

Check mark

Exchange affected components if damage is found

Check mark

Ensure there are no foreign bodies or defective or loose parts on the robot

Check mark

Safety and Electrical Checks

Check mark

Verify all required safety equipment is correctly installed and operational

Check mark

Check that the power supply ratings correspond to the local supply voltage and mains type

Run this procedureArrow right

Industrial Robot Check

Check mark

Pre-Maintenance Safety Measures

Check mark

Carry out work outside the danger zone

Check mark

If work inside the danger zone is necessary, have additional safety measures been defined?

Check mark

Switch off the industrial robot and secure it with a padlock

Check mark

If work with the robot controller switched on is necessary, is it being done in operating mode T1?

Check mark

Work in Progress Safety Measures

Check mark

Label the system with a sign indicating that work is in progress

Check mark

Ensure EMERGENCY STOP devices remain active

Check mark

Have all deactivated safety functions or safeguards been reactivated after work completion?

Run this procedureArrow right

5000 Hourly Counterbalancing System Inspection

Check mark

Preconditions

Check mark

Ensure the robot is operational and can be moved at jog velocity.

Check mark

Verify there is no hazard posed by system components or other robots.

Check mark

Secure the robot if work is being performed directly on it.

Check mark

Inspection Procedure

Check mark

Enter the hydraulic oil pressure with the link arm in -90° position.

Check mark

Is the hydraulic oil pressure within the setpoint tolerance of -5 bar?

Check mark

Check the add-on parts for the following conditions

Check mark

Inspect the condition of the collar for damage or fouling.

Run this procedureArrow right

Industrial Robot Start-up Check

Check mark

Pre-start-up Safety Checks

Check mark

Ensure systems and devices are complete and operational

Check mark

Are all safety circuits functioning correctly?

Check mark

Observe valid national or regional work safety regulations

Check mark

Password Management

Check mark

Change default passwords for user groups

Check mark

Communicate passwords only to authorized personnel

Check mark

Connection Verification

Check mark

Connect manipulator to the corresponding robot controller only

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from KUKA

Explore Other Assets