MaintainX Asset Hub logo
EnterprisePricing
Goulds Pumps

Goulds Pumps Pump 3355 2.5 x 4-8A-3000

Need answers fast?
Explore the manual using AI.

Goulds Pumps Pump 3355 2.5 x 4-8A-3000
Goulds Pumps Pump 3355 2.5 x 4-8A-3000

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Goulds Pumps Pump 3355 2.5 x 4-8A-3000

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Goulds Pumps Pump 3355 2.5 x 4-8A-3000

Goulds Pumps Pump 3355 2.5 x 4-8A-3000

Create an account to install this asset package.

Maintenance Plans for Goulds Pumps Pump Model 3355 2.5 x 4-8A-3000

Integrate maintenance plans directly into your work orders in MaintainX.

Pump Maintenance

Check mark

6.4 Disassembly

Check mark

Safety Precautions

Check mark

6.4.3 Drain the pump

Check mark

Allow all system and pump components to cool before handling

Check mark

If the pumped fluid is non-conductive, drain and flush the pump with a conductive fluid under safe conditions

Check mark

6.4.4 Prepare for disassembly

Check mark

Position the pump for disassembly

Check mark

6.4.6 Disassemble the discharge end ball bearing for the radial suction configuration

Check mark

Disassemble steps

Run this procedureArrow right

Coupling Alignment Check

Check mark

4.3.1 Alignment checks

Check mark

Perform alignment checks under these circumstances

Check mark

Perform periodic alignment checks following plant operating procedures

Check mark

Enter the Total Indicated Reading (T.I.R.) at operating temperature

Check mark

Enter the tolerance of the indicator

Check mark

4.3.3 Alignment measurement guidelines

Check mark

Rotate the pump coupling half and the driver coupling half together so that the indicator rods have contact with the same points on the driver coupling half

Check mark

Move or shim only the driver to make adjustments

Check mark

Are the hold-down bolts for the driver tight when taking indicator measurements?

Run this procedureArrow right

Pump Startup Check

Check mark

5.1 Preparation for startup

Check mark

Flush and clean the system thoroughly to remove dirt or debris in the pipe system.

Check mark

Is the pumped fluid temperature expected to exceed 93°C | 200°F?

Check mark

Warm up the pump prior to operation if fluid temperature exceeds 93°C | 200°F.

Check mark

Enter the casing temperature after circulating fluid through the pump.

Check mark

Soak for 2 hours at process fluid temperature.

Check mark

Bring variable-speed drivers to the rated speed quickly.

Check mark

Ensure set screws in the seal locking ring are tightened and centering clips removed.

Check mark

Verify the following before starting the pump

Run this procedureArrow right

After Maintenance Bearing Lubrication

Check mark

6.2.5 Lubricate the bearings after a shutdown period

Check mark

Flush out the bearings and bearing frame with a light oil to remove contaminants

Check mark

Flush the bearing housing with the proper lubricating oil to ensure oil quality after cleaning

Run this procedureArrow right

Initial Pump Alignment Check

Check mark

Make the final alignment of the pump and driver

Check mark

Run the unit under actual operating conditions to reach operating temperature

Check mark

Shut down the pump and the driver

Check mark

Remove the coupling guard

Check mark

Check the alignment while the unit is still hot

Check mark

Reinstall the coupling guard

Check mark

Restart the pump and driver

Check mark

Is the Total Indicated Reading (T.I.R.) at 0.05 mm | 0.002 in. or less at operating temperature?

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Goulds Pumps

Explore Other Assets