MaintainX Asset Hub logo
EnterprisePricing
Goulds Pumps

Goulds Pumps Vertical Turbine Pump VIT-FF 10D

Need answers fast?
Explore the manual using AI.

Goulds Pumps Vertical Turbine Pump VIT-FF 10D
Goulds Pumps Vertical Turbine Pump VIT-FF 10D

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Goulds Pumps Vertical Turbine Pump VIT-FF 10D

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Goulds Pumps Vertical Turbine Pump VIT-FF 10D

Goulds Pumps Vertical Turbine Pump VIT-FF 10D

Create an account to install this asset package.

Maintenance Plans for Goulds Pumps Vertical Turbine Pump Model VIT-FF 10D

Integrate maintenance plans directly into your work orders in MaintainX.

Thrust Pot Oil Level Inspection

Check mark

Thrust pot lubrication guidelines

Check mark

Verify that pumps are shipped without oil

Check mark

Ensure oil-lubricated bearings are lubricated at the job site

Check mark

Refer to Thrust Pot IOM for lubrication requirements

Check mark

Check oil level when not operating

Check mark

Measure oil level in the sight gauge

Check mark

Is the oil level between 0.635 to 0.3175 mm (1/8 in. to 1/4 in.) from the top of the oil sight gauge?

Check mark

Check oil level when operating

Check mark

Is the oil level lower than the required level as indicated on the oil sight gauge?

Run this procedureArrow right

Thrust Pot Oil Change

Check mark

Thrust pot lubrication guidelines

Check mark

Flush the oil reservoir to remove all grit particles in the oil reservoir sump.

Check mark

Use the specified type of oil for flushing the reservoir.

Check mark

Note any specific instructions from the Thrust Pot IOM for oil changing requirements.

Run this procedureArrow right

1 Monthly Storage Pump Maintenance

Check mark

2.4 Pump and bowl assembly storage requirements

Check mark

Rotate the shaft and bowl assembly shaft counterclockwise at least 3 turns

Check mark

Ensure the shaft is not left in a previous or extreme position

Check mark

Check that the shaft rotates freely

Check mark

2.4 Pump and bowl assembly storage requirements

Check mark

Inspect the unit to ensure all preservatives are intact

Check mark

Seal all pipe threads and flanged pipe covers with tape

Check mark

Renew rust preventative on all uncoated surfaces

Check mark

2.4.1 Extended long-term storage for partially assembled pumps

Run this procedureArrow right

Mechanical Seal Inspection

Check mark

Mechanical seal leaks

Check mark

Allow time for seal adjustment if slight leaks occur at start-up

Check mark

Run pump continuously if leaks decrease while running

Check mark

Inspect for constant leaks during operation

Check mark

Check for secondary seal damage or warped/cracked seal faces if constant leaks occur

Check mark

Replacement guidelines — Mechanical seal checks

Check mark

Check shaft or sleeve for pits, burrs, or sharp edges

Check mark

Polish shaft or sleeve with fine emery cloth to remove burrs and sharp edges

Run this procedureArrow right

Packing Adjustment

Check mark

6.2 Adjust and replace the packing

Check mark

Check conditions for packing adjustment

Check mark

Is the leakage rate less than one drop per second?

Check mark

Is the environment Ex-classified?

Check mark

6.2.1 Adjust the packing when leaking is excessive

Check mark

Tighten the gland nuts one-quarter turn with the pump in operation

Check mark

Have the leaks decreased to a steady state of two drops per second?

Check mark

Shut down the pump if leaks continue to exceed two drops per second

Check mark

Allow the packing to compress until the gland is about to contact the upper face of the stuffing box

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Goulds Pumps

Explore Other Assets