MaintainX Asset Hub logo
EnterprisePricing
Goulds Pumps

Goulds Pumps Vertical Turbine Pump VIT-FF 8D

Need answers fast?
Explore the manual using AI.

Goulds Pumps Vertical Turbine Pump VIT-FF 8D
Goulds Pumps Vertical Turbine Pump VIT-FF 8D

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Goulds Pumps Vertical Turbine Pump VIT-FF 8D

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Goulds Pumps Vertical Turbine Pump VIT-FF 8D

Goulds Pumps Vertical Turbine Pump VIT-FF 8D

Create an account to install this asset package.

Maintenance Plans for Goulds Pumps Vertical Turbine Pump Model VIT-FF 8D

Integrate maintenance plans directly into your work orders in MaintainX.

Routine Pump Inspection

Check mark

6.1 Maintenance schedule

Check mark

Check for unusual noise, vibration, and bearing temperatures of thrust pot or electric motor

Check mark

Ensure bearing housings are free from insulation and dust accumulation

Check mark

Check the pump and piping for leaks

Check mark

Analyze the vibration

Run this procedureArrow right

1 Monthly Storage Pump Maintenance

Check mark

2.4 Pump and bowl assembly storage requirements

Check mark

Rotate the shaft and bowl assembly shaft counterclockwise at least 3 turns

Check mark

Ensure the shaft is not left in a previous or extreme position

Check mark

Check that the shaft rotates freely

Check mark

2.4 Pump and bowl assembly storage requirements

Check mark

Inspect the unit to ensure all preservatives are intact

Check mark

Seal all pipe threads and flanged pipe covers with tape

Check mark

Renew rust preventative on all uncoated surfaces

Check mark

2.4.1 Extended long-term storage for partially assembled pumps

Run this procedureArrow right

Thrust Pot Oil Level Inspection

Check mark

Thrust pot lubrication guidelines

Check mark

Check that the pump is shipped without oil

Check mark

Ensure oil-lubricated bearings are lubricated at the job site

Check mark

Refer to Thrust Pot IOM for lubrication requirements

Check mark

Oil level inspection when not operating

Check mark

Measure the oil level in the sight gauge

Check mark

Is the oil level between 0.635 to 0.3175 mm (1/8 in. to 1/4 in.) from the top of the oil sight gauge?

Check mark

Oil level inspection when operating

Check mark

Check if the oil level is lower than the required level as indicated on the oil sight gauge

Run this procedureArrow right

3 Monthly Pump Inspection

Check mark

6.1 Maintenance schedule

Check mark

Check that the foundation and the hold-down bolts are tight

Run this procedureArrow right

Packing Adjustment

Check mark

6.2 Adjust and replace the packing

Check mark

Never over-tighten packing to the point where less than one drop per second is observed. Over-tightening can cause excessive wear and power consumption during operation.

Check mark

Adjust the packing when one of the following conditions occurs: the leakage rate exceeds two drops per second, or there is overheating or no leakage.

Check mark

If you cannot tighten the packing to obtain less than the specified leakage rate, then replace the packing.

Check mark

6.2.1 Adjust the packing when leaking is excessive

Check mark

Perform this procedure if leaks exceed two drops per second.

Check mark

With the pump in operation, tighten the gland nuts one-quarter turn.

Check mark

Check if the packing has equalized against the increased pressure by ensuring the leaks have decreased to a steady state.

Check mark

If the leaks decrease to two drops per second, then you are finished.

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Goulds Pumps

Explore Other Assets