MaintainX Asset Hub logo
EnterprisePricing
Goulds Pumps

Goulds Pumps Vertical Turbine Pump VIT-FF 6D

Need answers fast?
Explore the manual using AI.

Goulds Pumps Vertical Turbine Pump VIT-FF 6D
Goulds Pumps Vertical Turbine Pump VIT-FF 6D

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Goulds Pumps Vertical Turbine Pump VIT-FF 6D

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Goulds Pumps Vertical Turbine Pump VIT-FF 6D

Goulds Pumps Vertical Turbine Pump VIT-FF 6D

Create an account to install this asset package.

Maintenance Plans for Goulds Pumps Vertical Turbine Pump Model VIT-FF 6D

Integrate maintenance plans directly into your work orders in MaintainX.

Thrust Pot Oil Level Inspection

Check mark

Thrust pot lubrication guidelines

Check mark

Verify lubrication requirements

Check mark

Measure oil level when not operating

Check mark

Is the oil level within the required range when not operating?

Check mark

Is the oil level lower than the required level when operating?

Check mark

Ensure pump is not operated if oil level is not at the required level

Run this procedureArrow right

Wear Ring Replacement

Check mark

Replacement guidelines — Impeller replacement

Check mark

Inspect impeller vanes for replacement

Check mark

Inspect vane edges for replacement

Check mark

Remove the bowl and impeller wear rings

Check mark

Remove the setscrews or grind off the tack weld if present

Check mark

Cut two V-shaped grooves on the bowl or impeller wear ring approximately 180° apart using a diamond-point chisel

Check mark

Knock the end of one half of the ring in and pry the ring out using a chisel or drift punch

Check mark

Machine the wear ring off on high-alloy materials using a lathe, ensuring not to damage the ring seat

Check mark

Installing the turbine bowl and impeller wear ring

Run this procedureArrow right

Thrust Pot Oil Change

Check mark

Thrust pot lubrication guidelines

Check mark

Flush the oil reservoir to remove all grit particles in the oil reservoir sump

Check mark

Use the specified type of oil for flushing the reservoir

Check mark

Observe the instructions in the Thrust Pot IOM for oil changing requirements

Run this procedureArrow right

Enclosed Lineshaft Lubrication System Maintenance

Check mark

4.4.11 Set up the lubrication system

Check mark

Observe instructions on the submittal document.

Check mark

Fill the oil reservoir with oil.

Check mark

Check the lubricator feed and ensure the oil reservoir is flowing freely.

Check mark

Set the proper drops per minute on the regulator based on shaft size.

Check mark

Is synthetic turbine oil ISO VG 32 used for general applications?

Check mark

Consult ITT for more specific data and note any special instructions.

Run this procedureArrow right

Packing Adjustment

Check mark

6.2 Adjust and replace the packing

Check mark

Check conditions for packing adjustment

Check mark

Is the leakage rate less than one drop per second after adjustment?

Check mark

Is the environment Ex-classified?

Check mark

6.2.1 Adjust the packing when leaking is excessive

Check mark

Tighten the gland nuts one-quarter turn with the pump in operation

Check mark

Has the leakage decreased to two drops per second?

Check mark

Shut down the pump if leakage continues

Check mark

Allow the packing to compress until the gland is about to contact the upper face of the stuffing box

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Goulds Pumps

Explore Other Assets