MaintainX Asset Hub logo
EnterprisePricing
Goulds Pumps

Goulds Pumps Vertical Turbine Pump VIT-FF 14D

Need answers fast?
Explore the manual using AI.

Goulds Pumps Vertical Turbine Pump VIT-FF 14D
Goulds Pumps Vertical Turbine Pump VIT-FF 14D

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Goulds Pumps Vertical Turbine Pump VIT-FF 14D

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Goulds Pumps Vertical Turbine Pump VIT-FF 14D

Goulds Pumps Vertical Turbine Pump VIT-FF 14D

Create an account to install this asset package.

Maintenance Plans for Goulds Pumps Vertical Turbine Pump Model VIT-FF 14D

Integrate maintenance plans directly into your work orders in MaintainX.

Thrust Pot Oil Change

Check mark

6.3 Thrust pot lubrication guidelines

Check mark

Flush the oil reservoir to remove all grit particles in the oil reservoir sump

Check mark

Use the specified type of oil for flushing the reservoir

Check mark

Observe the instructions in the Thrust Pot IOM for oil changing requirements

Run this procedureArrow right

Mechanical Seal Inspection

Check mark

Mechanical seal leaks

Check mark

Is the seal leaking slightly at start-up?

Check mark

Does the leak decrease while running?

Check mark

Does the leak remain constant during operation?

Check mark

Replacement guidelines — Mechanical seal checks

Check mark

Check that the shaft or sleeve is free of pits, burrs, or sharp edges.

Check mark

Remove any burrs and sharp edges by polishing with a fine emery cloth.

Run this procedureArrow right

Wear Ring Replacement

Check mark

Replacement guidelines — Impeller replacement

Check mark

Replace impeller vanes if grooved deeper than 1.6 mm or worn evenly more than 0.8 mm.

Check mark

Replace vane edges if cracks, pitting, or corrosion damage are observed.

Check mark

Remove the bowl and impeller wear rings

Check mark

Remove locking methods from wear rings

Check mark

Cut two V-shaped grooves on the bowl or impeller wear ring approximately 180° apart using a diamond-point chisel.

Check mark

Knock the end of one half of the ring in and pry the ring out using a chisel or drift punch.

Check mark

For high-alloy materials, machine the wear ring off using a lathe without damaging the ring seat.

Check mark

Installing the turbine bowl and impeller wear ring

Run this procedureArrow right

Routine Pump Inspection

Check mark

6.1 Maintenance schedule

Check mark

Check for unusual noise, vibration, and bearing temperatures of thrust pot or electric motor

Check mark

Ensure bearing housings are free from insulation and dust accumulation

Check mark

Check the pump and piping for leaks

Check mark

Analyze the vibration

Run this procedureArrow right

Initial Pump Startup Check

Check mark

5.1.1 Prepare for startup

Check mark

Confirm completion of initial procedures

Check mark

Verify mechanical seal lubrication and piping connection

Check mark

Verify operation and regulation of cooling, heating, and flushing lines

Check mark

Verify connections to driver and starting device match wiring diagram

Check mark

Verify voltage, phase, and frequency on motor nameplate agree with line current

Check mark

Rotate shaft manually to ensure impellers are not binding

Check mark

Verify driver bearings are properly lubricated and check oil level in housing

Check mark

Verify auxiliary seal components are properly vented

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Goulds Pumps

Explore Other Assets