MaintainX Asset Hub logo
EnterprisePricing
Goulds Pumps

Goulds Pumps Vertical Turbine Pump VIT-FF 12D

Need answers fast?
Explore the manual using AI.

Goulds Pumps Vertical Turbine Pump VIT-FF 12D
Goulds Pumps Vertical Turbine Pump VIT-FF 12D

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Goulds Pumps Vertical Turbine Pump VIT-FF 12D

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Goulds Pumps Vertical Turbine Pump VIT-FF 12D

Goulds Pumps Vertical Turbine Pump VIT-FF 12D

Create an account to install this asset package.

Maintenance Plans for Goulds Pumps Vertical Turbine Pump Model VIT-FF 12D

Integrate maintenance plans directly into your work orders in MaintainX.

Enclosed Lineshaft Lubrication System Maintenance

Check mark

4.4.11 Set up the lubrication system

Check mark

Observe instructions on the submittal document

Check mark

Fill the oil reservoir with oil

Check mark

Check the lubricator feed and ensure the oil reservoir is flowing freely

Check mark

Set the proper drops per minute on the regulator based on shaft size

Check mark

Is synthetic turbine oil ISO VG 32 used for general applications?

Run this procedureArrow right

Mechanical Seal Inspection

Check mark

Mechanical seal leaks

Check mark

Allow time for seal adjustment if slight leaks occur at start-up

Check mark

Run pump continuously if leaks decrease while running

Check mark

Check for constant leaks during operation

Check mark

Inspect for secondary seal damage or warped/cracked seal faces if constant leaks occur

Check mark

Replacement guidelines — Mechanical seal checks

Check mark

Check shaft or sleeve for pits, burrs, or sharp edges

Check mark

Polish shaft or sleeve with fine emery cloth to remove burrs and sharp edges

Run this procedureArrow right

Packing Adjustment

Check mark

6.2 Adjust and replace the packing

Check mark

Check conditions for packing adjustment

Check mark

Is the packing adjustment necessary based on the conditions?

Check mark

6.2.1 Adjust the packing when leaking is excessive

Check mark

Tighten the gland nuts one-quarter turn with the pump in operation

Check mark

Has the leakage decreased to two drops per second?

Check mark

Shut down the pump if leakage continues to exceed two drops per second

Check mark

Allow the packing to compress until the gland is about to contact the upper face of the stuffing box

Check mark

Remove the split gland, add one extra packing ring, and readjust

Run this procedureArrow right

Pump Maintenance

Check mark

6.4 Disassembly

Check mark

6.4.1 Disassembly precautions

Check mark

Disconnect and lock out driver power

Check mark

Ensure pump is isolated from system and pressure is relieved

Check mark

Wear appropriate gloves while handling worn pump components

Check mark

6.4.2 Disassemble the head and column

Check mark

Remove the necessary components

Check mark

Uncouple the driver or gear box from the pump shaft and mounting flanges

Check mark

Remove all hold-down bolts and integral piping

Run this procedureArrow right

Routine Pump Inspection

Check mark

6.1 Maintenance schedule

Check mark

Check for unusual noise, vibration, and bearing temperatures of thrust pot or electric motor

Check mark

Ensure bearing housings are free from insulation and dust accumulation

Check mark

Check the pump and piping for leaks

Check mark

Analyze the vibration

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Goulds Pumps

Explore Other Assets