MaintainX Asset Hub logo
EnterprisePricing
Goulds Pumps

Goulds Pumps Pump 3355 2.5 x 4-8A-1500

Need answers fast?
Explore the manual using AI.

Goulds Pumps Pump 3355 2.5 x 4-8A-1500
Goulds Pumps Pump 3355 2.5 x 4-8A-1500

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Goulds Pumps Pump 3355 2.5 x 4-8A-1500

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Goulds Pumps Pump 3355 2.5 x 4-8A-1500

Goulds Pumps Pump 3355 2.5 x 4-8A-1500

Create an account to install this asset package.

Maintenance Plans for Goulds Pumps Pump Model 3355 2.5 x 4-8A-1500

Integrate maintenance plans directly into your work orders in MaintainX.

6000 Hourly Ball Bearing Lubrication

Check mark

6.2.2 Grease lubrication schedule

Check mark

Verify re-lubrication intervals by speed

Check mark

Enter the actual operating speed (rpm)

Check mark

Enter the grease quantity for suction side (oz)

Check mark

Enter the grease quantity for discharge side (oz)

Check mark

6.2.3 Lubricating-grease requirements

Check mark

Select the grease type used

Check mark

Is the temperature of pumped fluid less than 177°C | 350°F?

Check mark

Is the grease consistency NLGI 2?

Run this procedureArrow right

1 Yearly Pump Performance Inspection

Check mark

6.1 Maintenance schedule — Annual inspections

Check mark

Enter the pump capacity

Check mark

Enter the pump pressure

Check mark

Enter the pump power

Check mark

Does the pump performance satisfy your process requirements?

Check mark

Have the process requirements changed?

Check mark

Disassemble the pump and inspect it if necessary

Check mark

Is the pumped fluid abrasive or corrosive?

Check mark

Is the environment classified as potentially explosive?

Run this procedureArrow right

3 Monthly Pump Alignment Inspection

Check mark

6.1 Maintenance schedule — Three-month inspections

Check mark

Check that the foundation and the hold-down bolts are tight

Check mark

Is the shaft alignment correct?

Check mark

Realign the shaft if required

Check mark

Is the pumped fluid abrasive or corrosive?

Check mark

Is the environment classified as potentially explosive?

Check mark

Describe any adjustments made or issues found

Run this procedureArrow right

Pump Maintenance

Check mark

6.4 Disassembly

Check mark

Ensure safety precautions are followed

Check mark

6.4.3 Drain the pump

Check mark

Ensure safety precautions are followed

Check mark

6.4.4 Prepare for disassembly

Check mark

Position the pump for disassembly

Check mark

6.4.6 Disassemble the discharge end ball bearing for the radial suction configuration

Check mark

Disassemble components

Check mark

Check the shaft surface for damage and grind away any furrows

Run this procedureArrow right

Pump Startup Check

Check mark

5.1 Preparation for startup

Check mark

Flush and clean the system thoroughly to remove dirt or debris in the pipe system.

Check mark

If temperatures of the pumped fluid will exceed 93°C | 200°F, warm up the pump prior to operation.

Check mark

Circulate a small amount of fluid through the pump until the casing temperature is within 38°C | 100°F of the fluid temperature.

Check mark

Flow fluid from pump inlet to discharge drain for warm-up.

Check mark

Soak for 2 hours at process fluid temperature.

Check mark

Bring variable-speed drivers to the rated speed as quickly as possible.

Check mark

Ensure set screws in the seal locking ring are tightened and centering clips removed if a cartridge mechanical seal is used.

Check mark

Verify the following before starting any pump

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Goulds Pumps

Explore Other Assets