Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Goulds Pumps Pump 3355 2.5 x 4-8A-1500
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
6000 Hourly Ball Bearing Lubrication
6.2.2 Grease lubrication schedule
Verify re-lubrication intervals by speed
Enter the actual operating speed (rpm)
Enter the grease quantity for suction side (oz)
Enter the grease quantity for discharge side (oz)
6.2.3 Lubricating-grease requirements
Select the grease type used
Is the temperature of pumped fluid less than 177°C | 350°F?
Is the grease consistency NLGI 2?
1 Yearly Pump Performance Inspection
6.1 Maintenance schedule — Annual inspections
Enter the pump capacity
Enter the pump pressure
Enter the pump power
Does the pump performance satisfy your process requirements?
Have the process requirements changed?
Disassemble the pump and inspect it if necessary
Is the pumped fluid abrasive or corrosive?
Is the environment classified as potentially explosive?
3 Monthly Pump Alignment Inspection
6.1 Maintenance schedule — Three-month inspections
Check that the foundation and the hold-down bolts are tight
Is the shaft alignment correct?
Realign the shaft if required
Is the pumped fluid abrasive or corrosive?
Is the environment classified as potentially explosive?
Describe any adjustments made or issues found
Pump Maintenance
6.4 Disassembly
Ensure safety precautions are followed
6.4.3 Drain the pump
Ensure safety precautions are followed
6.4.4 Prepare for disassembly
Position the pump for disassembly
6.4.6 Disassemble the discharge end ball bearing for the radial suction configuration
Disassemble components
Check the shaft surface for damage and grind away any furrows
Pump Startup Check
5.1 Preparation for startup
Flush and clean the system thoroughly to remove dirt or debris in the pipe system.
If temperatures of the pumped fluid will exceed 93°C | 200°F, warm up the pump prior to operation.
Circulate a small amount of fluid through the pump until the casing temperature is within 38°C | 100°F of the fluid temperature.
Flow fluid from pump inlet to discharge drain for warm-up.
Soak for 2 hours at process fluid temperature.
Bring variable-speed drivers to the rated speed as quickly as possible.
Ensure set screws in the seal locking ring are tightened and centering clips removed if a cartridge mechanical seal is used.
Verify the following before starting any pump
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX