MaintainX Asset Hub logo
EnterprisePricing
Goulds Pumps

Goulds Pumps Vertical Turbine Pump VIT-FF 16D

Need answers fast?
Explore the manual using AI.

Goulds Pumps Vertical Turbine Pump VIT-FF 16D
Goulds Pumps Vertical Turbine Pump VIT-FF 16D

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Goulds Pumps Vertical Turbine Pump VIT-FF 16D

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Goulds Pumps Vertical Turbine Pump VIT-FF 16D

Goulds Pumps Vertical Turbine Pump VIT-FF 16D

Create an account to install this asset package.

Maintenance Plans for Goulds Pumps Vertical Turbine Pump Model VIT-FF 16D

Integrate maintenance plans directly into your work orders in MaintainX.

Initial Pump Startup Check

Check mark

5.1.1 Prepare for startup

Check mark

Confirm completion of initial procedures

Check mark

Verify mechanical seal lubrication and piping connection

Check mark

Verify operation and regulation of cooling, heating, and flushing lines

Check mark

Verify connections to driver and starting device match wiring diagram

Check mark

Verify voltage, phase, and frequency on motor nameplate agree with line current

Check mark

Rotate shaft manually to ensure impellers are not binding

Check mark

Verify driver bearings are properly lubricated and check oil level in housing

Check mark

Verify auxiliary seal components are properly vented

Run this procedureArrow right

Thrust Pot Oil Level Inspection

Check mark

Thrust pot lubrication guidelines

Check mark

Check that the pump is shipped without oil

Check mark

Ensure oil-lubricated bearings are lubricated at the job site

Check mark

Refer to Thrust Pot IOM for lubrication requirements

Check mark

Oil level inspection when not operating

Check mark

Measure the oil level in the sight gauge

Check mark

Is the oil level between 0.635 to 0.3175 mm (1/8 in. to 1/4 in.) from the top of the oil sight gauge?

Check mark

Oil level inspection when operating

Check mark

Check if the oil level is lower than the required level as indicated on the oil sight gauge

Run this procedureArrow right

3 Monthly Pump Inspection

Check mark

6.1 Maintenance schedule

Check mark

Check that the foundation and the hold-down bolts are tight

Run this procedureArrow right

Packing Adjustment

Check mark

6.2 Adjust and replace the packing

Check mark

Check conditions for packing adjustment

Check mark

Is the packing adjustment necessary based on conditions?

Check mark

6.2.1 Adjust the packing when leaking is excessive

Check mark

Tighten the gland nuts one-quarter turn with the pump in operation

Check mark

Has the leakage decreased to two drops per second?

Check mark

Shut down the pump if leakage continues to exceed two drops per second

Check mark

Allow the packing to compress until the gland is about to contact the upper face of the stuffing box

Check mark

Remove the split gland, add one extra packing ring, and readjust

Run this procedureArrow right

Wear Ring Replacement

Check mark

Impeller Replacement Guidelines

Check mark

Check impeller vanes for grooves deeper than 1.6 mm or wear more than 0.8 mm

Check mark

Inspect vane edges for cracks, pitting, or corrosion damage

Check mark

Remove the Bowl and Impeller Wear Rings

Check mark

Remove setscrews or grind off tack welds if present

Check mark

Cut two V-shaped grooves on the bowl or impeller wear ring 180° apart

Check mark

Knock the end of one half of the ring in and pry the ring out

Check mark

Machine the wear ring off for high-alloy materials

Check mark

Installing the Turbine Bowl and Impeller Wear Ring

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Goulds Pumps

Explore Other Assets