MaintainX Asset Hub logo
EnterprisePricing
Cornell Pump Company

Cornell Pump Company Pump 4NNT

Need answers fast?
Explore the manual using AI.

Cornell Pump Company Pump 4NNT
Cornell Pump Company Pump 4NNT

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Cornell Pump Company Pump 4NNT

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Cornell Pump Company Pump 4NNT

Cornell Pump Company Pump 4NNT

Create an account to install this asset package.

Maintenance Plans for Cornell Pump Company Pump Model 4NNT

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Mechanical Seal Leakage Inspection

Check mark

3200-632 Maintenance — Instructions for Mechanical Seal

Check mark

Examine the pump for leakage

Check mark

Is the leakage reducing to almost zero?

Check mark

Examine the assembly for proper seal installation if leakage persists

Check mark

Ensure the pump is not run dry unless equipped with Run-Dry option

Run this procedureArrow right

1000 Hourly Frame Bearing Re-Lubrication

Check mark

Lubrication Instructions for Frame Sizes 2-5-11 and EM309

Check mark

Enter the total running time between regreasing (hours)

Check mark

Enter the approximate amount of grease per line fitting (cubic inches)

Check mark

Verify grease compatibility

Check mark

Remove plastic cover from zerk fittings and ensure cleanliness

Check mark

Use hand-operated grease gun to pump grease into each bearing cavity

Check mark

Ensure surplus grease goes through the bearing into the center part of the frame

Check mark

Ensure grease and fittings are absolutely clean

Check mark

Lubrication Instructions for Frame Sizes 6-7-8-16 (60B4 through 68B4)

Run this procedureArrow right

Run-Dry Reservoir Lubricant Level Check

Check mark

3200-625 Run-Dry Seal Instructions and Parts Page

Check mark

Check the lubricant level in the reservoir

Check mark

Is the lubricant level above the bottom sight glass?

Check mark

Purge air from the upper circulation hose if filling the reservoir with lubricant

Check mark

Is the reservoir being filled during pump operation?

Check mark

Is there water accumulation in the reservoir?

Check mark

Is the fluid level depleting rapidly?

Check mark

Is there leakage of reservoir fluid from the gland?

Check mark

Recommended reservoir lubricant

Run this procedureArrow right

3 Monthly Frame Oil Change — F5K

Check mark

3200-902 Lubrication Instructions — Oil Lubricated Frame Pumps (F5K)

Check mark

Verify frame size and oil capacity

Check mark

Is the oil renewal interval within 3-4 months?

Check mark

Add oil through the pipe plug opening at the top of the housing

Check mark

Fill oil to the level indicated on the side of the housing

Check mark

Ensure no dirt and moisture entered during oil addition

Check mark

Is the oil level maintained when the pump is not operating?

Check mark

Verify oil type based on temperature

Check mark

Measure the bearing frame temperature at the drain connection

Run this procedureArrow right

Wear Ring Inspection

Check mark

3200-326 Startup Checklist — Instructions for Pumps with Balance Line and Wear Rings

Check mark

Check wear ring clearance

Check mark

Is the wear ring clearance within acceptable limits?

Check mark

Inspect balance lines for obstructions

Check mark

Check balance lines for pinching, bending, or corrosion

Check mark

Replace wear rings if clearance exceeds .03" per side

Check mark

Replace balance lines if pinched, bent, or corroded

Run this procedureArrow right

Parts for Cornell Pump Company Pump 4NNT

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Cornell 60/40 Propylene Glycol Run-Dry Fluid With Corrosion Inhibitor

N10263-415

Cornell 60/40 Propylene Glycol Run-Dry Fluid With Corrosion Inhibitor

N10263-415

Cornell 60/40 Propylene Glycol Run-Dry Fluid With Corrosion Inhibitor

N10263-415

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Cornell Pump Company

Explore Other Assets