Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Teikoku Electric Pump F450-12536A4BM-1820P1AV
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Bearing Inspection
Bearing Condition Check
Inspect the following points for the bearings
Is there any issue with the inspected points?
Bearing Removal and Replacement
Is bearing replacement needed?
Remove the Set Screw (48) and take out the bearing
Bearing Wear Limits Check
Select the motor frame for wear limit check
Enter the measured øA-øB value (mm)
TRG Bearing Wear Monitor Periodic Inspection
TRG Bearing Wear Monitor
Check the TRG meter periodically during operation
Was the initial TRG reading recorded?
Determine bearing changing intervals using color coding system if initial reading was not recorded
Check bearing wear using the TRG meter color change as a reference
Is the increase of TRG readings 0.3 or more (Yellow)?
Stop the pump and check bearings if TRG readings increase by 0.3 or more
Do not operate if TRG meter condition is RED
Check TRG meter colored scale zones
Overload Relay Inspection
5.3.1 Setting Overload Relay
Enter the rated current indicated on the nameplate
Enter the operation current
Select the variation of voltage & load
Calculate and set the overload relay value
Is the overload relay set as close to actual operating conditions as possible?
Does the overload relay setting not exceed the nameplate full load rating?
Filter and Circulation Pipe Inspection
Filter and Circulation Pipe Inspection
Inspect Filter (03) for blockages or clogs
Inspect Circulation Pipe (34) for blockages or clogs
Does this apply to F and FA plan pumps with circulation pipe construction?
Pump Storage Maintenance
5.5 Shutdown Procedure
Shut all valves after stopping the pump
Drain the entire pump and connected piping
Ensure pump only contains liquid before restarting if liquid could freeze or crystallize
Confirm if the pump is removed from service for an extended period
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX