MaintainX Asset Hub logo
EnterprisePricing
Teikoku Electric

Teikoku Electric Pump F150-5024A4BM-0608P1AV

Need answers fast?
Explore the manual using AI.

Teikoku Electric Pump F150-5024A4BM-0608P1AV
Teikoku Electric Pump F150-5024A4BM-0608P1AV

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Teikoku Electric Pump F150-5024A4BM-0608P1AV

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Teikoku Electric Pump F150-5024A4BM-0608P1AV

Teikoku Electric Pump F150-5024A4BM-0608P1AV

Create an account to install this asset package.

Maintenance Plans for Teikoku Electric Pump Model F150-5024A4BM-0608P1AV

Integrate maintenance plans directly into your work orders in MaintainX.

Pump Storage Maintenance

Check mark

5.5 Shutdown Procedure

Check mark

Shut all valves after stopping the pump

Check mark

Drain the entire pump and connected piping

Check mark

Ensure pump only contains liquid before restarting if liquid could freeze or crystallize

Check mark

Confirm if the pump is removed from service for an extended period

Run this procedureArrow right

Overload Relay Inspection

Check mark

5.3.1 Setting Overload Relay

Check mark

Set overload relay at rated current indicated on the nameplate

Check mark

Ensure overload relay is set as close to actual operating conditions as possible

Check mark

Confirm relay setting does not exceed the nameplate full load rating

Check mark

Determine relay setting based on voltage & load variation

Check mark

Confirm relay setting is for initial commissioning

Run this procedureArrow right

Pump Priming and Air Venting Inspection

Check mark

5.3.2 Priming and Air Venting

Check mark

Open vent valve slowly and pay attention to liquid, especially for toxic or high temperature liquid

Check mark

Close discharge valve

Check mark

Open suction valve

Check mark

Open discharge valve for a few seconds and close it again

Check mark

Bleed air from the air vent valve (36)

Check mark

If handling a dangerous liquid, did you pay full attention to air venting?

Check mark

For R & RA-type pumps, are all valves in reverse circulation piping opened?

Run this procedureArrow right

Pump Maintenance

Check mark

6.1 Disassembly

Check mark

Ensure all safety precautions are followed

Check mark

Remove Drain Plug (59) or open drain valve to drain the liquid in the pump

Check mark

Check for high pressure buildup before opening Air Vent Valve (36)

Check mark

Remove Circulation Pipe (34) or heat exchanger (B-type)

Check mark

Insert support under Casing (01) to relieve stress from piping

Check mark

Remove fixing Bolt (46B) or (46C) of Casing (01) for back pullout disassembly

Check mark

Remove Bolt (46D) and slide the pump backward on the Base (40)

Check mark

Inspect pump casing for wear

Run this procedureArrow right

Pre-Start Inspection

Check mark

5.3.5 Trial Operation

Check mark

Open suction valve

Check mark

Close discharge valve

Check mark

Check that valves in reverse circulation piping are opened (for R & RA-type)

Check mark

Slightly open discharge valve

Check mark

Switch on pump

Check mark

Check discharge pressure

Check mark

Check indication of TRG meter

Check mark

TRG Meter Status

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Teikoku Electric

Explore Other Assets