

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Teikoku Electric Pump F40-2512A4BM-0203P1AV
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Bearing Inspection
Bearing Condition Check
Inspect the following points for the bearings
Is there any issue with the inspected points?
Bearing Removal and Replacement
Is bearing replacement needed?
Remove the Set Screw (48) and take out the bearing
Bearing Wear Limits Check
Select the motor frame for wear limit check
Enter the measured øA-øB value (mm)
Pump Priming and Air Venting Inspection
5.3.2 Priming and Air Venting
Open vent valve slowly and pay attention to liquid, especially for toxic or high temperature liquid
Complete priming in the following order
Bleed air from the air vent valve (36)
Is the pump type R or RA?
Filter and Circulation Pipe Inspection
Filter and Circulation Pipe Inspection
Inspect Filter (03) for blockages
Inspect Circulation Pipe (34) for clogs
Does this apply to F and FA plan pumps with circulation pipe construction?
Pre-Start Inspection
5.3.5 Trial Operation
Open suction valve
Close discharge valve
Check that valves in reverse circulation piping are opened (for R & RA-type)
Slightly open discharge valve
Switch on pump
Check discharge pressure
Check indication of TRG meter
TRG meter status
Circulation Flow Rate Inspection
5.4 Operation Details
Adjust valve for R & RA-type pumps
Ensure all valves in the reverse circulation line are fully open during pump operation
Verify correct restriction orifice is installed in the reverse circulation line
Record the reverse circulation flow rate
Is the flow rate within the specified range?
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













