

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Tajima Embroidery Machine TMAR-K1202C
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
6 Monthly Slim Cylinder Bed Greasing
Safety Precautions
Turn OFF the power switch before starting the greasing process.
Ensure no moving machine units are in operation.
Grease Specification
Use KING STAR EP NO.2: 400G or equivalent grease as specified by TAJIMA.
Consult the distributor if the specified grease is unavailable.
Greasing Procedure
Apply grease to the slim cylinder bed.
Was the greasing completed successfully?
3 Monthly Head Greasing
Safety Precautions
Turn OFF the power switch before starting the greasing process.
Grease Specification
Use NIG LUBE PG: 300ML or equivalent grease as specified by TAJIMA.
Head Greasing Procedure
Inject grease into the following components using a syringe
1 Weekly Head Cleaning
WARNING: Turn OFF the power switch
Cleaning Process
Use a cleaning tool or air compressor to clean the 1st tension
Use a cleaning tool or air compressor to clean the head
Post-Cleaning Check
Is the power switch turned back ON?
Was the cleaning process completed successfully?
6 Monthly ATH Cam Greasing
Safety Precautions
Turn OFF the power switch before starting the greasing process
Grease Specification
Use KING STAR EP NO.2: 400G grease or equivalent
Greasing Process
Apply grease to the ATH cam and steel plate (back of border frame)
Post Greasing Check
Is the greasing process completed successfully?
Turn ON the power switch after completing the greasing process
5 Hourly Rotary Hook Lubrication
Safety Precautions
Turn OFF the power switch
Ensure no power is supplied to the machine
Lubrication Preparation
Use only Tajima's genuine TF oil or equivalent (Viscosity grade = VG20)
Lubrication Process
Lubricate the rotary hook raceway using the oiler
Lubricate the rotary hook lubrication hole using the oiler
Access the parts list for your equipment in MaintainX.
KING STAR EP NO.2: 400G
750103004000
NIG LUBE PG: 300ML
750104001000
KING STAR EP NO.2: 400G
750103004000
NIG LUBE PG: 300ML
750104001000
KING STAR EP NO.2: 400G
750103004000
NIG LUBE PG: 300ML
750104001000
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













