Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Teikoku Electric Pump F25-2008A4BM-0102P1AV
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Bearing Inspection
Bearing Condition Check
Inspect the following points for the bearings
Is there any issue with the inspected points?
Bearing Removal and Replacement
Is bearing replacement needed?
Remove the Set Screw (48) and take out the bearing
Bearing Wear Limits Check
Select the motor frame for bearing wear limits
Enter the measured øA-øB value (mm)
Pump Priming and Air Venting Inspection
5.3.2 Priming and Air Venting
Open vent valve slowly and pay attention to liquid, especially for toxic or high temperature liquid
Close discharge valve
Open suction valve
Open discharge valve for a few seconds and close it again
Bleed air from the air vent valve (36)
If handling a dangerous liquid, did you pay full attention to air venting?
For R & RA-type pumps, are all valves in reverse circulation piping opened?
Pump Maintenance
6.1 Disassembly
Ensure all safety precautions are followed
Remove Drain Plug (59) or open drain valve to drain the liquid in the pump
Check for high pressure buildup before opening Air Vent Valve (36)
Remove Circulation Pipe (34) or heat exchanger (B-type)
Insert support under Casing (01) to relieve stress from piping
Remove fixing Bolt (46B) or (46C) of Casing (01) for back pullout disassembly
Remove Bolt (46D) and slide the pump backward on the Base (40)
Inspect pump casing for wear
Pre-Start Inspection
Trial Operation
Open suction valve
Close discharge valve
Check that valves in reverse circulation piping are opened (for R & RA-type)
Slightly open discharge valve
Switch on pump
Check discharge pressure
Check indication of TRG meter
Meter overscale: Pump rotates in reverse direction — correct connection of electrical terminals
Pump Storage Maintenance
5.5 Shutdown Procedure
Shut all valves after stopping the pump
Drain the entire pump and connected piping
Ensure pump only contains liquid before restarting if liquid could freeze or crystallize
Confirm if the pump is removed from service for an extended period
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX