Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Teikoku Electric Pump F200-6526A4BM-0810P1AV
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Bearing Inspection
Bearing Condition Check
Inspect the following points for the bearings
Is there any issue with the inspected points?
Bearing Removal and Replacement
Is bearing replacement needed?
Remove the Set Screw (48) and take out the bearing
Bearing Wear Limits Check
Select the motor frame for wear limit check
Enter the measured øA-øB value (mm)
Circulation Flow Rate Inspection
Operation Details
Adjust valve to set reverse circulation flow at the specified flow rate for R & RA-type pumps
Verify that adjusting the flow rate for R & RA-type pumps is not required when an orifice is used
Ensure all valves in the reverse circulation line remain fully open while the pump is in operation
Verify that the correct restriction orifice is properly installed in the reverse circulation line
Check that the reverse circulation flow rate is kept at or within the specified range at all times
Refer to the pump data sheet for the required flow rate
Pre-Start Inspection
5.3.5 Trial Operation
Open suction valve
Close discharge valve
Check that valves in reverse circulation piping are opened (for R & RA-type)
Slightly open discharge valve
Switch on pump
Check discharge pressure
Check indication of TRG meter
TRG meter status
Pump Priming and Air Venting Inspection
5.3.2 Priming and Air Venting
Open vent valve slowly and pay attention to liquid, especially for toxic or high temperature liquid
Close discharge valve
Open suction valve
Open discharge valve for a few seconds and close it again
Bleed air from the air vent valve (36)
If handling a dangerous liquid, did you pay full attention to air venting?
For R & RA-type pumps, are all valves in reverse circulation piping opened?
Filter and Circulation Pipe Inspection
Filter and Circulation Pipe Inspection
Inspect Filter (03) for blockages or clogs
Inspect Circulation Pipe (34) for blockages or clogs
Does this apply to F and FA plan pumps with circulation pipe construction?
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX