Teikoku Electric Pump F400-10034A4BM-1618P1AV
Teikoku Electric Pump F400-10034A4BM-1618P1AV

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Teikoku Electric Pump F400-10034A4BM-1618P1AV

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Teikoku Electric Pump F400-10034A4BM-1618P1AV

Teikoku Electric Pump F400-10034A4BM-1618P1AV

Create an account to install this asset package.

Maintenance Plans for Teikoku Electric Pump Model F400-10034A4BM-1618P1AV

Integrate maintenance plans directly into your work orders in MaintainX.

Pump Priming and Air Venting Inspection

Check mark

5.3.2 Priming and Air Venting

Check mark

Ensure all valves are in the correct initial position

Check mark

Open vent valve slowly and monitor for liquid presence, especially if handling toxic or high temperature liquid

Check mark

Open discharge valve for a few seconds and then close it again

Check mark

Bleed air from the air vent valve (36)

Check mark

If handling a dangerous liquid, did you pay full attention to air venting?

Check mark

For R & RA-type pumps, are all valves in reverse circulation piping opened?

Run this procedureArrow right

Shaft Sleeve and Thrust Collar Inspection

Check mark

Shaft Sleeve (17) and Thrust Collar (18) Inspection

Check mark

Inspect for contact marks or wear

Check mark

Are there any other contact marks or wear?

Check mark

General Inspection

Check mark

Check the following points

Run this procedureArrow right

Fastener Inspection

Check mark

5.2 Installation and Wiring

Check mark

Fasten Holder (41) to the Base (40) with Bolt (46D), Plate Washer (54) and Spring Washer (53C)

Check mark

Check the tightness of every fastener, especially Bolts (46B), (46C), and (46F)

Check mark

Re-tighten all bolts before use

Check mark

Confirm this is the initial installation

Run this procedureArrow right

Motor Jacket Inspection

Check mark

Utility Piping Inspection

Check mark

Verify specified media and capacity are used for heating/cooling jacket and heat exchanger

Check mark

Adopt data from Table 5-2 unless otherwise specified

Check mark

Record the temperature of the coolant

Check mark

Is the coolant temperature less than 35°C (95°F)?

Check mark

Coolant Flow Rate Verification

Check mark

Verify coolant flow rates by motor frame

Check mark

Coolant Flow Order Verification

Check mark

Is the coolant flow order Motor Jacket → Heat Exchanger?

Run this procedureArrow right

Pump Maintenance

Check mark

6.1 Disassembly

Check mark

Ensure valves are fully closed

Check mark

Disconnect power cables to prevent safety hazards

Check mark

Remove Circulation Pipe (34) or heat exchanger (B-type)

Check mark

Insert support under Casing (01) to relieve stress from piping

Check mark

Remove fixing Bolt (46B) or (46C) of Casing (01) for back pullout disassembly

Check mark

Remove Bolt (46D) and slide pump backward on Base (40)

Check mark

Inspect pump casing for wear

Check mark

Measure the gap "g" before further disassembling

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Teikoku Electric

Explore Other Assets