MaintainX Asset Hub logo
EnterprisePricing
Cornell Pump Company

Cornell Pump Company Pump 10NHTA

Need answers fast?
Explore the manual using AI.

Cornell Pump Company Pump 10NHTA
Cornell Pump Company Pump 10NHTA

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Cornell Pump Company Pump 10NHTA

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Cornell Pump Company Pump 10NHTA

Cornell Pump Company Pump 10NHTA

Create an account to install this asset package.

Maintenance Plans for Cornell Pump Company Pump Model 10NHTA

Integrate maintenance plans directly into your work orders in MaintainX.

Balance Line Inspection

Check mark

3200-326 Startup Checklist — Instructions for Pumps with Balance Line and Wear Rings

Check mark

Inspect balance lines for issues

Check mark

Check wear rings for damage

Check mark

Are all balance lines in good condition?

Check mark

Replace any damaged balance lines or wear rings if necessary

Run this procedureArrow right

1000 Hourly Frame Bearing Re-Lubrication

Check mark

3200-901 Lubrication Instructions — Grease Lubricated Frame Pumps (Frame sizes 2-5-11 and EM309)

Check mark

Enter the total running time between regreasing (hours)

Check mark

Enter the approximate amount of grease per line fitting (cubic inches)

Check mark

Select the grease used for these bearings

Check mark

Remove plastic cover from zerk fittings and ensure cleanliness

Check mark

Use hand-operated grease gun and pump grease into each bearing cavity

Check mark

Ensure surplus grease goes through the bearing into the center part of the frame

Check mark

Ensure grease and fittings are absolutely clean

Check mark

3200-901 Lubrication Instructions — Grease Lubricated Frame Pumps (Frame sizes 6-7-8-16)

Run this procedureArrow right

1000 Hourly / 1 Yearly Run-Dry Reservoir Fluid Change

Check mark

3200-625 Run-Dry Seal Instructions and Parts Page

Check mark

Ensure the following conditions are met before proceeding

Check mark

Purge air from the upper circulation hose to prevent vapor locking

Check mark

Check for water accumulation in the reservoir

Check mark

Check if the fluid level depletes rapidly

Run this procedureArrow right

1 Yearly Cutter Clearance Calibration

Check mark

3200-992 Cutter Modification Kit — Adjusting

Check mark

Ensure all safety precautions are in place

Check mark

Disconnect external connections to gain access to suction inlet of pump

Check mark

Isolate and lockout all power to the pump and motor

Check mark

Remove the coupling guard for manual rotation of the pump

Check mark

Loosen cap screws holding stationary cutter plate to volute casing or suction cover

Check mark

Bottom out the stationary cutter plate to the rotating cutter ring

Check mark

Remove debris if necessary

Check mark

Set stationary cutter plate to rotating cutter ring clearance between .010"-.020" using adjustable set screws

Run this procedureArrow right

3 Monthly Frame Oil Change — F5K

Check mark

3200-902 Lubrication Instructions — Oil Lubricated Frame Pumps (F5K)

Check mark

Verify frame size and oil capacity

Check mark

Enter the oil renewal interval (months)

Check mark

Measure the oil level when the pump is not operating

Check mark

Is the oil level at the indicated level on the side of the housing?

Check mark

Add oil through the pipe plug opening at the top of the housing if necessary

Check mark

Select the oil type used based on temperature

Check mark

Measure the bearing frame temperature at the drain connection

Check mark

Is the bearing frame temperature approximately 10°F lower than the oil temperature?

Run this procedureArrow right

Parts for Cornell Pump Company Pump 10NHTA

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Cornell 60/40 Propylene Glycol Run-Dry Fluid With Corrosion Inhibitor

N10263-415

Cornell 60/40 Propylene Glycol Run-Dry Fluid With Corrosion Inhibitor

N10263-415

Cornell 60/40 Propylene Glycol Run-Dry Fluid With Corrosion Inhibitor

N10263-415

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Cornell Pump Company

Explore Other Assets