Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Teikoku Electric Pump F60-3215N4BL-0204TF1AV
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pump Discharge Pressure Inspection
Operation Details
Enter the discharge pressure reading
Is the discharge pressure stable?
Enter the motor amps reading
Are the motor amps within the expected range?
Is the pump operating above the rated full load amps?
Is there excessive air or vapor in the liquid supply?
Is the pump losing its prime and becoming vapor bound?
Are there large fluctuations in the discharge pressure gauge?
Circulation Flow Rate Inspection
5.4 Operation Details
Adjust valve for R & RA-type pumps
Ensure all valves in the reverse circulation line are fully open during pump operation
Verify correct restriction orifice is installed in the reverse circulation line
Enter the reverse circulation flow rate
Is the reverse circulation flow rate within the specified range?
Pump Maintenance
6.1 Disassembly
Ensure valves are fully closed
Disconnect power cables to prevent safety hazards
Remove Drain Plug (59) or open drain valve to drain the liquid in the pump
Check for high pressure buildup before opening Air Vent Valve (36)
Remove Circulation Pipe (34) or heat exchanger (B-type)
Insert support under Casing (01) to relieve stress from piping
Remove fixing Bolt (46B) or (46C) of Casing (01) for back pullout disassembly
Remove Bolt (46D) and slide the pump backward on the Base (40)
Overload Relay Inspection
5.3.1 Setting Overload Relay
Set overload relay at the rated current indicated on the nameplate
Ensure the overload relay is set as close to actual operating conditions as possible
Confirm the relay setting does not exceed the nameplate full load rating
Determine relay setting based on voltage & load variation
Confirm relay setting for initial commissioning before first start
Pump Priming and Air Venting Inspection
5.3.2 Priming and Air Venting
Open vent valve slowly and pay attention to liquid, especially for toxic or high temperature liquid
Complete priming in the following order
Bleed air from the air vent valve (36)
If handling a dangerous liquid, did you pay full attention to air venting?
For R & RA-type pumps, are all valves in reverse circulation piping opened?
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX