Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Teikoku Electric Pump F500-12538A4BM-2022P1AV
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pump Priming and Air Venting Inspection
5.3.2 Priming and Air Venting
Open vent valve slowly and pay attention to liquid, especially for toxic or high temperature liquid
Close discharge valve
Open suction valve
Open discharge valve for a few seconds and close it again
Bleed air from the air vent valve (36)
If handling a dangerous liquid, did you pay full attention to air venting?
For R & RA-type pumps, are all valves in reverse circulation piping opened?
Circulation Flow Rate Inspection
5.4 Operation Details
Adjust valve for R & RA-type pumps
Ensure all valves in the reverse circulation line are fully open during pump operation
Verify correct restriction orifice is installed in the reverse circulation line
Enter the reverse circulation flow rate
Is the flow rate within the specified range?
Overload Relay Inspection
5.3.1 Setting Overload Relay
Enter the rated current indicated on the nameplate
Is the overload relay set at the rated current indicated on the nameplate?
Is the overload relay set as close to actual operating conditions as possible?
Does the overload relay setting exceed the nameplate full load rating?
Select the recommended relay setting based on voltage & load variation
Confirm that the relay setting applies to initial commissioning — one-time setting before first start
Bearing Inspection
Bearing Condition Check
Inspect the following points for the bearings
Is there any issue with the inspected points?
Bearing Removal and Replacement
Is bearing replacement needed?
Remove the Set Screw (48) and take out the bearing
Bearing Wear Limits Check
Select the motor frame for bearing wear limits
Enter the measured øA-øB value (mm)
Pump Discharge Pressure Inspection
Operation Details
Check discharge pressure frequently during operation
Ensure pressure is stable in a non-variable closed loop
Check motor amps at normal operations
Verify motor amps are within the expected range
Ensure pump is not operating above the rated full load amps listed on the nameplate
Check for excessive air or vapor in the liquid supply
Stop the pump and vent all accumulated vapor if large fluctuations are observed in the discharge pressure gauge
Stop the pump if any abnormal noise or vibration is observed and check for possible causes
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.