Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Cornell Pump Company Pump 12NHTM
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Balance Line Inspection
3200-326 Startup Checklist — Instructions for Pumps with Balance Line and Wear Rings
Check wear rings for damage or excessive wear
Inspect balance lines for obstructions
Ensure balance lines are not pinched, bent, or corroded
Replace balance lines if necessary
1 Daily Mechanical Seal Leakage Inspection
3200-632 Maintenance — Instructions for Mechanical Seal
Examine the pump for leakage
Is the leakage reducing to almost zero?
Examine the assembly for proper seal installation if leakage persists
Ensure the pump is not run dry unless equipped with Run-Dry option
1000 Hourly / 1 Yearly Run-Dry Reservoir Fluid Change
3200-625 Run-Dry Seal Instructions and Parts Page
Check fluid change interval
Verify fluid type
Purge air from upper circulation hose
Check for water accumulation in the reservoir
Check fluid level depletion rate
Indicate potential mechanical seal failure
Fill reservoir with lubricant
5 Monthly Frame Oil Change — F16K
Preparation
Ensure the pump is not operating before starting the oil change.
Verify the frame size is F16K.
Check the serial number plate for a 'K' to confirm oil lubrication.
Oil Draining
Remove the pipe plug at the bottom of the housing to drain old oil.
Ensure all old oil has been completely drained.
Oil Filling
Measure 2 quarts of turbine oil (ISO VG32 or ISO VG68 depending on temperature).
2 Monthly Oil Frame Lip Seal Lubrication
3200-902 Lubrication Instructions — Oil Lubricated Frame Pumps
Ensure all lip seals are present in the bearing covers
Locate grease fittings in the bearing cover at both ends of the frame
Apply a small amount of multiple-purpose grease to each grease fitting
Was the lubrication completed successfully?
Access the parts list for your equipment in MaintainX.
Cornell 60/40 Propylene Glycol Run-Dry Fluid With Corrosion Inhibitor
N10263-415
Cornell 60/40 Propylene Glycol Run-Dry Fluid With Corrosion Inhibitor
N10263-415
Cornell 60/40 Propylene Glycol Run-Dry Fluid With Corrosion Inhibitor
N10263-415
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.