MaintainX Asset Hub logo
EnterprisePricing
Cornell Pump Company

Cornell Pump Company Pump 10NHTBH

Need answers fast?
Explore the manual using AI.

Cornell Pump Company Pump 10NHTBH
Cornell Pump Company Pump 10NHTBH

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Cornell Pump Company Pump 10NHTBH

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Cornell Pump Company Pump 10NHTBH

Cornell Pump Company Pump 10NHTBH

Create an account to install this asset package.

Maintenance Plans for Cornell Pump Company Pump Model 10NHTBH

Integrate maintenance plans directly into your work orders in MaintainX.

5 Monthly Frame Oil Change — F16K

Check mark

Preparation

Check mark

Ensure the pump is not operating before starting the oil change

Check mark

Verify frame size and oil capacity

Check mark

Oil Change Procedure

Check mark

Remove the pipe plug at the top of the housing

Check mark

Drain old oil completely

Check mark

Check for dirt and moisture in the housing

Check mark

Add new oil through the pipe plug opening

Check mark

Fill oil to the level indicated on the side of the housing

Run this procedureArrow right

Wear Ring Inspection

Check mark

3200-326 Startup Checklist — Instructions for Pumps with Balance Line and Wear Rings

Check mark

Check wear ring clearance

Check mark

Is the wear ring clearance within acceptable limits?

Check mark

Inspect balance lines for obstructions

Check mark

Check balance lines for pinching, bending, or corrosion

Check mark

Replace wear rings if clearance exceeds .03" per side

Check mark

Replace balance lines if pinched, bent, or corroded

Run this procedureArrow right

1000 Hourly / 1 Yearly Run-Dry Reservoir Fluid Change

Check mark

3200-625 Run-Dry Seal Instructions and Parts Page

Check mark

Ensure the following conditions are met before proceeding

Check mark

Purge air from the upper circulation hose to prevent vapor locking

Check mark

Check for water accumulation in the reservoir

Check mark

Check if the fluid level depletes rapidly

Run this procedureArrow right

3 Monthly Frame Oil Change — F5K

Check mark

3200-902 Lubrication Instructions — Oil Lubricated Frame Pumps

Check mark

Verify frame size and oil capacity

Check mark

Measure the bearing frame temperature at the drain connection

Check mark

Select the oil type based on temperature

Check mark

Ensure the pump is not operating before checking and filling oil

Check mark

Check for dirt and moisture in the oil opening

Check mark

Add oil through the pipe plug opening at the top of the housing

Check mark

Fill oil to the level indicated on the side of the housing

Check mark

Is the oil level maintained?

Run this procedureArrow right

1 Yearly Cutter Clearance Calibration

Check mark

3200-992 Cutter Modification Kit — Adjusting

Check mark

Ensure all safety precautions are in place

Check mark

Disconnect external connections to gain access to suction inlet of pump

Check mark

Isolate and lockout all power to the pump and motor

Check mark

Remove the coupling guard for manual rotation of the pump

Check mark

Loosen cap screws holding stationary cutter plate to volute casing or suction cover

Check mark

Bottom out the stationary cutter plate to the rotating cutter ring

Check mark

Remove debris if necessary

Check mark

Set stationary cutter plate to rotating cutter ring clearance between .010"-.020" using adjustable set screws

Run this procedureArrow right

Parts for Cornell Pump Company Pump 10NHTBH

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Cornell 60/40 Propylene Glycol Run-Dry Fluid With Corrosion Inhibitor

N10263-415

Cornell 60/40 Propylene Glycol Run-Dry Fluid With Corrosion Inhibitor

N10263-415

Cornell 60/40 Propylene Glycol Run-Dry Fluid With Corrosion Inhibitor

N10263-415

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Cornell Pump Company

Explore Other Assets