Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

York Rooftop Unit ZH090E54R5B5BCA2A1
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Belt Tension Adjustment
Preparation
Ensure the following components are present
Adjusting Belt Tension
Loosen the four bolts holding the motor base to the channels
Adjust the belt by turning nuts 'A' (see detail 'B')
Apply perpendicular force to one belt at the midpoint of the span using a belt tension checker
Enter the deflection distance obtained (in inches)
Use the recommended deflection force per the Belt Adjustment Table
Is the belt tension within the recommended deflection force range?
1 Yearly Smoke Detector Cleaning
Pre-Cleaning Inspection
Inspect the smoke detector for any visible damage or obstruction
Is the smoke detector securely mounted?
Cleaning Process
Turn off the power to the smoke detector
Remove the smoke detector from its mounting base
Clean the smoke detector using a vacuum cleaner or compressed air
Post-Cleaning Inspection
Reattach the smoke detector to its mounting base
Rooftop Unit Start-up Check
Prestart Check List
Check the electrical supply voltage being supplied
Set the room thermostat to the off position
Turn unit electrical power on
Set the room thermostat fan switch to on
Check indoor blower rotation
Check blower drive belt tension
Check the unit supply air (CFM)
Measure evaporator fan motor's amp draw
Air Quantity Check
Method One
Remove the dot plugs from the duct panel
Insert eight inches of 1/4 inch metal tubing into the airflow on both sides of the indoor coil
Ensure tubes are perpendicular to the airflow
Determine the pressure drop across a dry evaporator coil using an Inclined Manometer or Magnehelic
Are the compressors de-energized before taking measurements?
Determine the CFM through the unit from the pressure drop indicated by the manometer
Are the air filters clean?
Adjust Measured CFM to Required CFM
Supply Air Drive Adjustment
Supply Air Drive Adjustment
Pre-Adjustment Cautions
Review installation for errors, leaks, or undesirable system effects
Ensure only qualified personnel make blower speed changes
Adhere strictly to fan laws during adjustments
Blower Speed Adjustment
Measure current CFM
Enter required CFM
Enter existing datum diameter (DD)
Access the parts list for your equipment in MaintainX.
Optional Co2 Space Sensor Kit
2AQ04700524
Optional Co2 Sensor Kit
2AQ04700624
Fc Bus 22 Awg Stranded 3-Wire Twisted Shielded Cable Non-Plenum Application Anixter
CBL-22/3-FC-PVC
Fc Bus 22 Awg Stranded 3-Wire Twisted Shielded Cable Non-Plenum Application Belden
B5501FE
Fc Bus 22 Awg Stranded 3-Wire Twisted Shielded Cable Plenum Application Anixter
CBL-22/3-FC-PLN
Optional Co2 Space Sensor Kit
2AQ04700524
Optional Co2 Sensor Kit
2AQ04700624
Fc Bus 22 Awg Stranded 3-Wire Twisted Shielded Cable Non-Plenum Application Anixter
CBL-22/3-FC-PVC
Fc Bus 22 Awg Stranded 3-Wire Twisted Shielded Cable Non-Plenum Application Belden
B5501FE
Fc Bus 22 Awg Stranded 3-Wire Twisted Shielded Cable Plenum Application Anixter
CBL-22/3-FC-PLN
Optional Co2 Space Sensor Kit
2AQ04700524
Optional Co2 Sensor Kit
2AQ04700624
Fc Bus 22 Awg Stranded 3-Wire Twisted Shielded Cable Non-Plenum Application Anixter
CBL-22/3-FC-PVC
Fc Bus 22 Awg Stranded 3-Wire Twisted Shielded Cable Non-Plenum Application Belden
B5501FE
Fc Bus 22 Awg Stranded 3-Wire Twisted Shielded Cable Plenum Application Anixter
CBL-22/3-FC-PLN
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX