MaintainX, an Autodesk company
EnterprisePricing
Viking

Viking Pump L124A

Need answers fast?
Explore the manual using AI.

Viking Pump L124A
Viking Pump L124A

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Viking Pump L124A

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Viking Pump L124A

Viking Pump L124A

Create an account to install this asset package.

Maintenance Plans for Viking Pump Model L124A

Integrate maintenance plans directly into your work orders in MaintainX.

Packing Adjustment

Check mark

SAFETY INFORMATION!

Check mark

Acknowledge understanding of safety information

Check mark

Initial Packing Adjustment

Check mark

Perform initial packing adjustment carefully

Check mark

Is the packing gland adjusted correctly?

Check mark

Inspection and Adjustment

Check mark

Inspect for need of packing gland adjustment or replacement

Check mark

Contact Viking Pump® representative if necessary

Check mark

Ongoing Maintenance

Run this procedureArrow right

Thrust Bearing Adjustment

Check mark

Safety Precautions

Check mark

Ensure pressure in the chamber is completely vented

Check mark

Lock out or make non-operational the driving means

Check mark

Identify the liquid the pump has been handling

Check mark

Obtain and understand the material safety data sheet (MSDS) for the liquid

Check mark

Thrust Bearing Adjustment

Check mark

Loosen the two set screws in the outer face of the bearing housing

Check mark

Rotate the bearing housing clockwise until it cannot be turned anymore

Check mark

Mark the outside diameter of the bearing housing and the pump bracket

Run this procedureArrow right

Carbon Graphite Bushing Installation

Check mark

Preparation

Check mark

Ensure all necessary tools and materials are available, including lubricant and press.

Check mark

Add a chamfer on the bushing and the mating part.

Check mark

Installation with Press

Check mark

Use a press for installation.

Check mark

Ensure the bushing is started straight.

Check mark

Do not stop pressing operation until bushing is in proper position.

Check mark

Post-Installation Check

Check mark

Check bushing for cracks after installation.

Run this procedureArrow right

Packing Removal and Installation

Check mark

Safety Precautions

Check mark

Ensure the following safety measures are in place before starting

Check mark

Obtain and review the material safety data sheet (MSDS) for the liquid

Check mark

Removal: Packing

Check mark

Insert brass or plastic bar through port opening between rotor teeth or lock coupling end of shaft to keep shaft from turning

Check mark

Bend up tang of lockwasher and remove locknut and lockwasher from shaft using a spanner wrench

Check mark

Remove brass or plastic bar from port opening

Check mark

Loosen the two setscrews in the face of the bearing housing

Check mark

Remove the bearing housing assembly from the bracket

Run this procedureArrow right

End Clearance Adjustment

Check mark

Safety Precautions

Check mark

Ensure all pressure in the chamber has been completely vented through appropriate openings or connections.

Check mark

Lock out or make non-operational the driving means to prevent accidental start-up during maintenance.

Check mark

Identify the liquid the pump has been handling and understand the necessary safety precautions.

Check mark

Obtain and review the material safety data sheet (MSDS) for the liquid.

Check mark

End Clearance Adjustment Procedure

Check mark

Refer to TSM for specific model series procedure on adjusting end clearance.

Check mark

Has the end clearance been successfully adjusted?

Check mark

Verify improved pump performance after adjustment.

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Viking

Explore Other Assets