MaintainX, an Autodesk company
EnterprisePricing
Viking

Viking Pump LQ124A

Need answers fast?
Explore the manual using AI.

Viking Pump LQ124A
Viking Pump LQ124A

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Viking Pump LQ124A

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Viking Pump LQ124A

Viking Pump LQ124A

Create an account to install this asset package.

Maintenance Plans for Viking Pump Model LQ124A

Integrate maintenance plans directly into your work orders in MaintainX.

Carbon Graphite Bushing Installation

Check mark

Preparation

Check mark

Ensure all necessary tools and materials are available, including lubricant and press.

Check mark

Add a chamfer on the bushing and the mating part.

Check mark

Installation with Press

Check mark

Use a press for installation.

Check mark

Ensure the bushing is started straight.

Check mark

Do not stop pressing operation until bushing is in proper position.

Check mark

Post-Installation Check

Check mark

Check bushing for cracks after installation.

Run this procedureArrow right

Pump Relubrication

Check mark

Grease Bracket Fitting

Check mark

Select the pump series for relubrication

Check mark

Add grease to the bracket grease fitting until it comes out of the relief fitting on the opposite side of the bracket

Check mark

Select the type of lubricant used for bracket fitting

Check mark

Regrease Bearing Housing

Check mark

Regrease the bearing housing until grease comes out of the shaft end lip seal

Check mark

Select the type of grease used for bearing housing

Run this procedureArrow right

End Clearance Adjustment

Check mark

Safety Precautions

Check mark

Ensure all pressure in the chamber has been vented through appropriate openings or connections.

Check mark

Lock out or make non-operational the driving means to prevent accidental start-up.

Check mark

Identify the liquid the pump has been handling and understand the necessary safety precautions.

Check mark

Obtain and review the material safety data sheet (MSDS) for the liquid.

Check mark

End Clearance Adjustment Procedure

Check mark

Refer to TSM for specific model series procedure on adjusting end clearance.

Check mark

Has the end clearance been successfully adjusted?

Check mark

Verify improved pump performance after adjustment.

Run this procedureArrow right

Pressure Relief Valve Pressure Adjustment

Check mark

Safety Precautions

Check mark

Ensure pressure in the chamber is completely vented

Check mark

Ensure driving means is locked out or made non-operational

Check mark

Identify the liquid the pump has been handling

Check mark

Obtain and understand the material safety data sheet (MSDS) for the liquid

Check mark

Pressure Adjustment Instructions

Check mark

Remove valve cap and loosen locknut

Check mark

Install a pressure gauge in the discharge line

Check mark

Adjust the pressure setting using the adjusting screw

Run this procedureArrow right

Pump Cleaning

Check mark

Safety Information

Check mark

Read and understand the safety information before proceeding

Check mark

Ensure pump is turned off and disconnected from power source

Check mark

Inspect the pump for any visible damage

Check mark

Clean the exterior of the pump

Check mark

Check that all grease fittings are free from dirt

Check mark

Inspect and clean the pump's internal components

Check mark

Reassemble the pump and ensure all parts are securely in place

Check mark

Verify the pump is operating correctly after cleaning

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Viking

Explore Other Assets