

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Viking Positive Displacement Pump KK1124A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial 100 Hours Reducer Lubricant Change
Oil Type Selection
Select the oil type based on temperature conditions
Oil Quantity Verification
Verify the oil quantity for each reducer size
Initial Oil Filling
Fill the reducer with the correct type and quantity of oil before start-up
100 Hours Operation Check
Ensure the reducer has operated for 100 hours
Lubricant Change
Packing Maintenance
Initial Packing Adjustment
Ensure initial packing adjustment is done carefully
Is the packing gland over-tightened?
Inspection and Adjustment
Does the inspection reveal need for packing gland adjustment?
Does the inspection reveal need for packing replacement?
Contact Engineering Service
Contact Viking Pump® representative for Engineering Service Bulletin ESB-521 regarding repacking pump
Ongoing Maintenance
500 Hourly / 6 Monthly Pump Fittings Lubrication
Preparation
Ensure the pump is turned off and isolated from the power source
Gather necessary tools and materials, including a hand grease gun and multi-purpose grease, NLGI #2
Lubrication Process
Apply grease to the following lubrication fittings
Was the grease applied slowly with a hand gun?
Is the grease compatible with the grease used by Viking?
Post-Lubrication Check
Check for any leaks or excess grease around fittings
End Clearance Maintenance
Initial Inspection
Check for signs of wear on rotor teeth
Inspect the head for wear
End Clearance Adjustment
Refer to TSM for specific model series
Adjust the end clearance as per TSM instructions
Post Adjustment Verification
Measure the running clearance between rotor teeth and head
Is the clearance within the acceptable range?
Cartridge Mechanical Seal Replacement
Safety Precautions
Ensure safety measures are in place before opening any Viking pump liquid chamber
Removal: Cartridge Mechanical Seal
Insert brass or plastic bar through port opening between rotor teeth to keep shaft from turning
Bend up tang of lockwasher and remove locknut and lockwasher from shaft using a spanner wrench
Loosen two set screws in the face of the bearing housing and remove the bearing housing assembly from the bracket
Remove the pair of half round rings under the inner spacer collar from the shaft (AK, AL, K, KK, L, LQ, LL, LS sizes only)
Remove any flush or barrier fluid tubes connected to the seal gland
Replace or turn centering clips to original position
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













