MaintainX, an Autodesk company
EnterprisePricing
Viking

Viking Positive Displacement Pump LL4124B

Need answers fast?
Explore the manual using AI.

Viking Positive Displacement Pump LL4124B
Viking Positive Displacement Pump LL4124B

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Viking Positive Displacement Pump LL4124B

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Viking Positive Displacement Pump LL4124B

Viking Positive Displacement Pump LL4124B

Create an account to install this asset package.

Maintenance Plans for Viking Positive Displacement Pump Model LL4124B

Integrate maintenance plans directly into your work orders in MaintainX.

End Clearance Maintenance

Check mark

Initial Inspection

Check mark

Inspect rotor teeth for wear

Check mark

Inspect head for wear

Check mark

End Clearance Adjustment

Check mark

Is the end clearance within acceptable limits?

Check mark

Record the current end clearance measurement

Check mark

Adjust end clearance as per TSM guidelines

Check mark

Post-Adjustment Verification

Check mark

Is the pump performance improved after adjustment?

Run this procedureArrow right

1 Yearly Reducer Lubricant Change

Check mark

Oil Type Selection

Check mark

Select the oil type based on temperature conditions

Check mark

Oil Quantity for Each Size

Check mark

Verify the oil quantity for each reducer size

Check mark

Lubricant Change Procedure

Check mark

Drain existing oil from the reducer

Check mark

Refill with the selected oil type to the proper level

Check mark

Post-Change Verification

Check mark

Is the lubricant level correct after refill?

Run this procedureArrow right

Packing Replacement

Check mark

Safety Precautions

Check mark

Ensure the following safety measures are in place before opening any Viking pump liquid chamber

Check mark

Obtain and review the material safety data sheet (MSDS) for the liquid

Check mark

Removal: Packing

Check mark

Insert brass or plastic bar through port opening between rotor teeth or lock coupling end of shaft to keep shaft from turning

Check mark

Bend up tang of lockwasher and remove locknut and lockwasher from shaft using a spanner wrench

Check mark

Remove brass or plastic bar from port opening

Check mark

Loosen the two setscrews in the face of the bearing housing and remove the bearing housing assembly from the bracket

Check mark

Remove pair of half round rings under the inner spacer collar from the shaft (K, KK, LQ, LL, LS Sizes ONLY)

Run this procedureArrow right

Internal Parts Check

Check mark

Examine Internal Parts

Check mark

Remove the head of the pump

Check mark

Examine parts for wear

Check mark

Did the idler slide off the idler pin during removal?

Check mark

Replacement and Safety

Check mark

Is the idler bushing showing moderate wear?

Check mark

Is the idler pin showing moderate wear?

Check mark

Replace idler bushing if showing moderate wear

Check mark

Replace idler pin if showing moderate wear

Run this procedureArrow right

Packing Maintenance

Check mark

Initial Packing Adjustment

Check mark

Ensure initial packing adjustment is made carefully

Check mark

Is the packing gland over-tightened?

Check mark

Inspection and Adjustment

Check mark

Does the inspection reveal the need for packing gland adjustment?

Check mark

Does the inspection reveal the need for packing replacement?

Check mark

Contact Engineering Service

Check mark

Contact Viking Pump® representative for Engineering Service Bulletin ESB-521 regarding repacking pump

Check mark

Ongoing Maintenance

Run this procedureArrow right

Parts for Viking Positive Displacement Pump LL4124B

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Seal Installation Sleeves(AK-LL)

2-751-003-730

Seal Installation Sleeves(AK-LL)

2-751-003-730

Seal Installation Sleeves(AK-LL)

2-751-003-730

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Viking

Explore Other Assets