

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

ABB Industrial Palletizing Robot IRB 660-250/3.15
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
12000 Hourly Balancing Device Lubrication
Lubricating balancing device bearings
Move axis 2 to calibration position
Turn off all power supplies
Remove the locknut without losing the support washer
Fit the lubricating tool by hand
Grease through nipple on the lubricating tool
Continue filling grease until clean grease exudes behind the inner sealing ring
Repeat greasing procedure at the other bearing
Remove the lubricating tool and clean the threads on the shaft ends of grease
24000 Hourly Axis Gear Oil Change
3.4.2 Changing oil, axis-1 gearbox
Ensure all power supplies are turned off before entering the safeguarded space
Remove rear cover on the base by unscrewing its attachment screws
Pull out the draining hose from the rear of the base
Place an oil vessel close to hose end
Remove oil plug, filling to drain oil quicker
Open the hose end and drain the oil into a vessel
Close the oil drain hose, and put it back inside the base
Refit rear cover by securing it with its attachment screws
12 Monthly Robot Harness Inspection
Pre-Inspection Safety Measures
Ensure all power supplies are turned off
Cable Harness Inspection
Conduct overall inspection of the cable harness for wear and damage
Check the connectors at the base
Inspect the motor cables
Is the velcro strap properly attached to the adapter?
Check the cable guide on axis 2 for damage
Inspect the metal clamps on the lower arm
12 Monthly Balancing Device Inspection
Inspecting, balancing device bearings and piston rod guide ring
Ensure all power supplies are turned off before entering the safeguarded space
Move axis 2 to calibration position
Remove locknuts (KM10), sealing rings and support washers
Fit the auxiliary shafts on upper and lower axes of balancing device
Remove the protection hood from the M12 hole on top of the balancing device
Unload the bearings using a M12x50 screw
Pull out the cylinder slightly to inspect the inner rings
Wipe the inner rings clean and check for pressure marks or deformations
36 Monthly Battery Pack Replacement RMU
Preparation
Move the robot to its calibration position
Turn off all electric power supply
Turn off hydraulic pressure supply
Turn off air pressure supply
Safety Precautions
Read the safety information regarding ESD
Check hazards related to batteries
Battery Removal
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













