Manual for AXIS PTZ Network Camera P5514/-E

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

AXIS PTZ Network Camera P5514/-E

AXIS PTZ Network Camera P5514/-E

Create an account to install this asset package.

Maintenance Plans for AXIS PTZ Network Camera Model P5514/-E

Integrate maintenance plans directly into your work orders in MaintainX.

PTZ Testing

Check mark

PTZ Mechanism Test

Check mark

Navigate to Settings > System > Maintenance > PTZ status

Check mark

Click on Test to initiate PTZ mechanism test

Check mark

Error Handling

Check mark

Were any errors reported during the PTZ test?

Check mark

If errors were reported

Check mark

Navigate to Settings > System > Maintenance > Reports

Check mark

Click on Download the server report

Check mark

Contact axis.com/support

Run this procedureArrow right

Scratches / Cracks In Dome Cover Maintenance

Check mark

Inspection of Dome Cover

Check mark

Inspect the dome cover for scratches

Check mark

Inspect the dome cover for cracks

Check mark

Are there severe scratches or cracks on the dome cover?

Check mark

Replacement of Dome Cover

Check mark

Refer to the device’s installation guide for dome cover replacement instructions

Check mark

Order a replacement dome cover from an Axis reseller

Run this procedureArrow right

Outer Heat Sink Cleaning

Check mark

Preparation

Check mark

Turn off the device and unplug it from the power source

Check mark

Gather cleaning materials (soft brush, compressed air, and lint-free cloth)

Check mark

Cleaning Process

Check mark

Clean the outer heat sink using a soft brush to remove loose dust and debris

Check mark

Use compressed air to blow out any remaining dust from the heat sink fins

Check mark

Wipe the outer surface of the heat sink with a lint-free cloth

Check mark

Post-Cleaning Inspection

Check mark

Is the heat sink free of dust and debris?

Run this procedureArrow right

Bracket Inspection

Check mark

Bracket Inspection and Cleaning

Check mark

Inspect the bracket for insects and dirt

Check mark

Remove any insects and dirt from the bracket

Check mark

Axis Bracket Installation

Check mark

Is the camera installed on an Axis bracket?

Check mark

Install AXIS T91A6 Pipe Seal inside the bracket

Run this procedureArrow right

6 Monthly Pressurize Check

Check mark

Preparation

Check mark

Set the regulator gauge on the gas cylinder to 0.5 bar (7 psi)

Check mark

Remove the caps from the inlet valve and the pressure relief valve

Check mark

Filling Process

Check mark

Place the chuck on the inlet valve and press down to fill the camera with nitrogen

Check mark

Verify that the gas is flowing out by placing your hand over the pressure relief valve

Check mark

Lift the pressure relief valve to let the overpressure out of the camera unit

Check mark

Repeat the filling process a total of 3 times, leaving the camera pressurized the last time

Check mark

Completion

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.