MaintainX, an Autodesk company
EnterprisePricing
ABB

ABB Charging Station TWB UL 24 CJ 7TM-7M-0-0

Need answers fast?
Explore the manual using AI.

ABB Charging Station TWB UL 24 CJ 7TM-7M-0-0
ABB Charging Station TWB UL 24 CJ 7TM-7M-0-0

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for ABB Charging Station TWB UL 24 CJ 7TM-7M-0-0

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

ABB Charging Station TWB UL 24 CJ 7TM-7M-0-0

ABB Charging Station TWB UL 24 CJ 7TM-7M-0-0

Create an account to install this asset package.

Maintenance Plans for ABB Charging Station Model TWB UL 24 CJ 7TM-7M-0-0

Integrate maintenance plans directly into your work orders in MaintainX.

Routine Wallbox Maintenance

Check mark

7.1 Recommended Periodic Maintenance

Check mark

De-energize unit and inspect air filter

Check mark

Check input connections and terminations for proper torque values

Check mark

Check grounding resistance

Check mark

Exercise breakers

Check mark

Inspect HMI cover and components

Check mark

Clean interior with a HEPA vacuum

Check mark

Blow out rear cooling fins and remove any debris

Check mark

Reassemble and verify unit

Run this procedureArrow right

4 Monthly Cabinet Cleaning

Check mark

7.2 Cleaning of the cabinet

Check mark

Remove rough dirt by spraying with low-pressure tap water

Check mark

Apply a neutral or weak alkaline cleaning solution and let it soak

Check mark

Remove dirt by hand with a non-woven nylon hand pad

Check mark

Rinse thoroughly with tap water

Check mark

Check the coating and the front cover for damage

Check mark

Was high-pressure water jet used?

Check mark

Ensure the inside of the Terra DC Wallbox Charger is dry if high-pressure water jet was used

Check mark

Ensure compliance with cleaning agent guidelines

Run this procedureArrow right

6 Monthly Cabinet Cleaning

Check mark

7.2 Cleaning of the cabinet

Check mark

Remove rough dirt by spraying with low-pressure tap water.

Check mark

Apply a neutral or weak alkaline cleaning solution and let it soak.

Check mark

Remove dirt by hand with a non-woven nylon hand pad.

Check mark

Rinse thoroughly with tap water.

Check mark

Check the coating and the front cover for damage.

Check mark

Cautionary Measures

Check mark

Ensure no high-pressure water jets are used.

Check mark

Ensure the inside of the Terra DC Wallbox Charger is dry if a high-pressure water jet was used.

Run this procedureArrow right

Initial Wallbox Check

Check mark

Commissioning Preparation

Check mark

Verify commissioning prerequisites

Check mark

Enter end-user contact person details

Check mark

Enter charger address

Check mark

Enter coordinates longitude and latitude

Check mark

Enter site name

Check mark

Enter external fuse of the charger

Check mark

Enter SAT (Site Acceptance Test) date

Check mark

Enter location remarks

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from ABB

Explore Other Assets