MaintainX, an Autodesk company
EnterprisePricing
ABB

ABB Industrial Palletizing Robot IRB 660-180/3.15

Need answers fast?
Explore the manual using AI.

ABB Industrial Palletizing Robot IRB 660-180/3.15
ABB Industrial Palletizing Robot IRB 660-180/3.15

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for ABB Industrial Palletizing Robot IRB 660-180/3.15

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

ABB Industrial Palletizing Robot IRB 660-180/3.15

ABB Industrial Palletizing Robot IRB 660-180/3.15

Create an account to install this asset package.

Maintenance Plans for ABB Industrial Palletizing Robot Model IRB 660-180/3.15

Integrate maintenance plans directly into your work orders in MaintainX.

Battery Pack Replacement DSQC

Check mark

Preparation

Check mark

Move the robot to its calibration position

Check mark

Turn off all supplies

Check mark

Safety Precautions

Check mark

Read the safety information regarding ESD sensitivity

Check mark

Clean cover from metal residues before opening

Check mark

Battery Removal

Check mark

Remove the SMB battery cover by unscrewing the attachment screws

Check mark

Pull out the battery and disconnect the battery cable

Run this procedureArrow right

12 Monthly Signal Lamp Inspection

Check mark

Inspect that signal lamp is lit when motors are put in operation ('MOTORS ON')

Check mark

Safety Precautions

Check mark

Turn off electric power supply

Check mark

Turn off hydraulic pressure supply

Check mark

Turn off air pressure supply

Check mark

Fault Tracing

Check mark

Inspect whether the signal lamp is broken

Check mark

Replace the signal lamp if broken

Check mark

Inspect cable connections

Run this procedureArrow right

36 Monthly Battery Pack Replacement RMU

Check mark

Preparation

Check mark

Move the robot to its calibration position

Check mark

Turn off all electric power supply

Check mark

Turn off all hydraulic pressure supply

Check mark

Turn off all air pressure supply

Check mark

Safety Precautions

Check mark

Read the safety information regarding ESD

Check mark

Clean cover from metal residues before opening

Check mark

Battery Removal

Run this procedureArrow right

12 Monthly Balancing Device Inspection

Check mark

3.3.4 Inspecting, balancing device bearings and piston rod guide ring

Check mark

Inspecting, bearings

Check mark

Move axis 2 to calibration position

Check mark

Turn off all power supplies

Check mark

Remove locknuts (KM10), sealing rings and support washers

Check mark

Fit the auxiliary shafts on upper and lower axes of balancing device

Check mark

Remove the protection hood from the M12 hole on top of the balancing device

Check mark

Unload the bearings using a M12x50 screw

Check mark

Pull out the cylinder slightly to inspect inner rings

Run this procedureArrow right

Routine Robot Cleaning

Check mark

3.6.1 Cleaning the IRB 660

Check mark

Turn off all supplies before entering the safeguarded space

Check mark

Verify the protection type of the IRB 660 before cleaning

Check mark

Special cleaning considerations

Check mark

Cleaning methods for protection type Standard

Check mark

Ensure maximum water pressure at the nozzle is 700 kN/m2 (7 bar)

Check mark

Ensure minimum distance from nozzle to encapsulation is 0.4 meters

Check mark

Ensure maximum water flow is 20 liters/min

Check mark

Ensure movable cables can move freely

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from ABB

Explore Other Assets