Viking Positive Displacement Pump G4124B

Need answers fast?
Explore the manual using AI.

Viking Positive Displacement Pump G4124B
Viking Positive Displacement Pump G4124B

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Viking Positive Displacement Pump G4124B

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Viking Positive Displacement Pump G4124B

Viking Positive Displacement Pump G4124B

Create an account to install this asset package.

Maintenance Plans for Viking Positive Displacement Pump Model G4124B

Integrate maintenance plans directly into your work orders in MaintainX.

Packing Maintenance

Check mark

Initial Packing Adjustment

Check mark

Ensure initial packing adjustment is made carefully

Check mark

Is the packing gland over-tightened?

Check mark

Inspection and Adjustment

Check mark

Does the inspection reveal the need for packing gland adjustment?

Check mark

Does the inspection reveal the need for packing replacement?

Check mark

Contact Engineering Service

Check mark

Contact Viking Pump® representative for Engineering Service Bulletin ESB-521 regarding repacking pump

Check mark

Ongoing Maintenance

Run this procedureArrow right

Initial Pump Alignment Check

Check mark

Check Alignment After Mounting

Check mark

Ensure pump ports are square and in proper position

Check mark

Shim or move the pump as required

Check mark

Is piping forced to line up with the ports?

Check mark

Flexible Coupling Alignment Check

Check mark

Remove any coupling guards or covers

Check mark

Check alignment of the coupling halves using a straightedge

Check mark

V-Belt Drive Alignment Check

Check mark

Check alignment using a long straightedge or tightly drawn string across the face of the sheaves

Run this procedureArrow right

Component Mechanical Seal Replacement

Check mark

Safety Precautions

Check mark

Ensure all safety measures are in place before opening the pump chamber

Check mark

Removal of Component Mechanical Seal

Check mark

Insert brass or plastic bar through port opening to keep shaft from turning

Check mark

Bend up tang of lockwasher and remove locknut and lockwasher from shaft

Check mark

Loosen set screws in the face of the bearing housing and remove the bearing housing assembly

Check mark

Remove the pair of half round rings under the inner spacer collar from the shaft

Check mark

Loosen nuts and remove seal holder, seal seat and seal gasket(s)

Check mark

Loosen setscrews in mechanical seal rotary member

Run this procedureArrow right

Internal Parts Check

Check mark

Examine Internal Parts

Check mark

Remove the head of the pump

Check mark

Examine parts for wear

Check mark

Did the idler slide off the idler pin during removal?

Check mark

Replacement and Safety

Check mark

Is the idler bushing worn beyond moderate wear?

Check mark

Is the idler pin worn beyond moderate wear?

Check mark

Refer to TSM for procedure in removing head of the pump

Check mark

Ensure idler does not slide off the idler pin during head removal

Run this procedureArrow right

Pressure Relief Valve Maintenance

Check mark

Safety Precautions

Check mark

Ensure pressure in the chamber is completely vented through appropriate openings or connections.

Check mark

Lock out or make non-operational the driving means (motor, turbine, engine, etc.).

Check mark

Identify the liquid the pump has been handling and understand the necessary safety precautions.

Check mark

Obtain and review the material safety data sheet (MSDS) for the liquid.

Check mark

Pressure Adjustment

Check mark

Carefully remove valve cap covering the adjusting screw.

Check mark

Loosen locknut to allow pressure setting adjustment.

Check mark

Install a pressure gauge in the discharge line.

Run this procedureArrow right

Parts for Viking Positive Displacement Pump G4124B

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Seal Installation Sleeves(G)

2-751-001-730

Seal Installation Sleeves(G)

2-751-001-730

Seal Installation Sleeves(G)

2-751-001-730

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Viking

Explore Other Assets