MaintainX, an Autodesk company
EnterprisePricing
Viking

Viking Pump LQ124AE

Need answers fast?
Explore the manual using AI.

Viking Pump LQ124AE
Viking Pump LQ124AE

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Viking Pump LQ124AE

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Viking Pump LQ124AE

Viking Pump LQ124AE

Create an account to install this asset package.

Maintenance Plans for Viking Pump Model LQ124AE

Integrate maintenance plans directly into your work orders in MaintainX.

Pump Cleaning

Check mark

SAFETY INFORMATION!

Check mark

Acknowledge understanding of safety information

Check mark

Pre-Cleaning Inspection

Check mark

Ensure all safety equipment is in place

Check mark

Is the pump turned off and disconnected from power source?

Check mark

Cleaning Process

Check mark

Remove any visible dirt and debris from the pump exterior

Check mark

Clean the grease fittings

Check mark

Post-Cleaning Inspection

Run this procedureArrow right

500 Hourly / 6 Monthly Pump Lubrication

Check mark

Safety Information

Check mark

Read and understand the safety information regarding pump installation, operation, and maintenance.

Check mark

External Lubrication Application

Check mark

Apply multi-purpose grease, NLGI # 2, to all lubrication fittings using a hand gun.

Check mark

Ensure lubrication is applied every 500 hours of operation.

Check mark

Consultation

Check mark

Contact your Viking Pump® representative for specific lubrication questions.

Check mark

Check Engineering Service Bulletin ESB-515 for standard grease thickener compatibility.

Check mark

Temperature Considerations

Run this procedureArrow right

Pressure Relief Valve Pressure Adjustment

Check mark

Safety Precautions

Check mark

Ensure pressure in the chamber is completely vented

Check mark

Lock out or make non-operational the driving means

Check mark

Identify the liquid the pump has been handling

Check mark

Obtain and understand the material safety data sheet (MSDS) for the liquid

Check mark

Pressure Adjustment Procedure

Check mark

Remove valve cap and loosen locknut

Check mark

Install a pressure gauge in the discharge line

Check mark

Adjust the pressure setting using the adjusting screw

Run this procedureArrow right

Pump Relubrication

Check mark

Grease Application for Bracket

Check mark

Select the pump series for relubrication

Check mark

Add grease to the bracket grease fitting until it comes out of the relief fitting on the opposite side of the bracket

Check mark

Bearing Housing Relubrication

Check mark

Regrease the bearing housing until grease comes out of the shaft end lip seal

Run this procedureArrow right

End Clearance Adjustment

Check mark

Safety Precautions

Check mark

Ensure pressure in the chamber is completely vented

Check mark

Lock out or make non-operational the driving means

Check mark

Identify the liquid the pump has been handling

Check mark

Obtain and understand the material safety data sheet (MSDS) for the liquid

Check mark

End Clearance Adjustment

Check mark

Refer to TSM for procedure on adjusting end clearance for the specific pump model

Check mark

Adjust the end clearance between the rotor teeth and the head

Check mark

Check for improved pump performance after adjustment

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Viking

Explore Other Assets